Laserfiche WebLink
Page of <br /> SIDRPT Rev t o/o9 <br /> BRAUN <br /> I NTERTEC Special Inspection Daily Report <br /> City of VY-OVN Q <br /> Report No.: S �,W�1 e �'�v1 Date of This Report: '7 —gyp <br /> Project Name: broEUAMWINUc1.. 1 Project No.. C7",p g <br /> Project Address: <br /> Client. Client Project No.. <br /> I <br /> Project Manager: Vt't' Alk Temp/Weather: <br /> i Type of Inspection: Inspection Coverage: <br /> �,.....:M.„ <br /> ❑ Continuous ❑ Masonry ❑_Rebar Placement. ❑ Foundations ❑ Special Cases <br /> g' g `Concrete Plbti3mehf -" Firep roofing <br /> ❑ Piles&Piers ❑ Tendon Placement ❑ Soils <br /> Did the architect or engineer authorize changes to city approved plans? Yes ❑ (Listed Below) No ❑ <br /> i <br /> scripfion`and location of work completed: <br /> \�►�t�,. ��w[ c�1���°� 1b� y. o fi-�°`1 �j`L�rt o Ak.ti c.y.. (,V&a <br /> ron <br /> � � ��\lQ�" fl G.T f'Fyy�c, Codi coo/ r�RG.1Mg <br /> k2C. 3��` ewu , c.o \n \.t% skA geeyY. c�¢1 s�l•''c2 <br /> Listtmper6wed: <br /> ria <br /> e Are there any discrepancies noted from this day's observations? Yes ❑ No �] <br /> e Are there any outstanding discrepancies on this project? Yes ❑ No <br /> e If yes,see attached Summary Sheet. <br /> To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable <br /> workmanship provisions of the current IBC,except as noted above. <br /> Signed: —`d���, Date: <br /> Print Full Name: � ��bI.D.No.. <br /> White copy to Braun Jnfertec file. Yellow copy to Project Site Representative. <br /> Providing engineering and environmental solutions since 1957 <br />