Laserfiche WebLink
Page_ of_ <br /> BRAUN SIDRPT Rev 10/09 <br /> I NTE RTEC Special Inspection Daily Report <br /> City of <br /> Report No.: Date of This Report: 7.30 <br /> Project Name: AV-,. '0-&— Scams Project No.: 1E1 Dg 0 CZO <br /> Project Address: 7 <br /> Client: C lent Project No.: <br /> Project Manager: �� L/ Temp/Weather: —77905� © G <br /> Type of Inspection: Inspection Coverage: <br /> Continuous ❑ Masonry ❑ Rebar Placement <br /> ❑ Foundations El Special Cases <br /> ❑ Periodic ❑ Welding& Bolting B]""C-oncrete Placement <br /> ❑ Fireproofing <br /> ❑ Piles&Piers ❑ Tendon Placement ❑ Soils <br /> Did the architect or engineer authorize changes to city approved plans? Yes ❑ (Listed Below) No ❑ <br /> Description and location of work completed: <br /> Al 4re" <br /> le Ate4,- <br /> 'QaOy- �� . Gw� ad sl�t.;� .oaF►f�a,� .� .z�� lg <br /> Gtllf�i -� Dl.�5 <br /> r <br /> 7 <br /> List tests performed: y Av'�Q ® ���� '44r0 F 6y ,*// <br /> FYI 11 r Ctjl- <br /> • Are there any discrepancies noted from this day's observations? Yes ❑ No <br /> • Are there any outstanding discrepancies on this project? Yes ❑ No 0' <br /> • If yes,see attached Summary Sheet. <br /> To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable <br /> workmanship provisions of the current IBC,except as noted above. <br /> Signed: r Date: <br /> Print Full Name: �J ,v n I.D. No.: <br /> White copy to Braun Intertec file. Yellow copy to Project Site Representative. <br /> Providing engineering and environmental solutions since 1957 <br />