Laserfiche WebLink
Page— of <br /> SIDRPT Pm i o/og <br /> BRAUN <br /> INTERTEC Special Inspection Daily Report <br /> City of_&Iza <br /> Report No.: Date of This Report; <br /> Project Name: oject No.: <br /> V <br /> Project Address: <br /> _ LO-A4 L�O&L kjA-t.7__ <br /> Client: Client Project No.; <br /> Project Manager: Temp/Weather.- <br /> Type of Inspection; Inspection Coverage: <br /> ❑ Continuous El Masonry ❑ Rebar Placement ❑ Foundations. El Special Cam <br /> Periodic---...._.......................... Welding--&-Bolting-- ...........EI­Concrete--Placement 0*­Firdpf6ofihO ....... <br /> C1 Piles&Piers El Tendon Placement El Soils <br /> Did the architect or engineer authorize changes to city approved plans? Yes El {Listed Below) No F1 <br /> Description and location of work completed: <br /> OVA <br /> se 1--cig '0 Ole, <br /> g7 <br /> Ust tests performed; <br /> Lk R+-D' <br /> • Are there any discrepancies noted from this days observations? Yes E) No <br /> • Are there any outstanding discrepancies on this project? Yes [I No� <br /> • If yes,see attached Summary Sheet. <br /> To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable <br /> workmanship provisions of the current IBC,except as noted above. <br /> Signed: Date: <br /> Print Full Name. I.D. No.: <br /> White copy to Braun Interfec file. Yellow copy to Project Site Representative. <br /> Providing engineering and environmentd.whidm 9=1957 <br />