Laserfiche WebLink
Page of <br /> BRAUNcrest-dfn 4,07 <br /> I NTE RTEC Daily Field Notes <br /> Project No.: _91—`09"b�g/"C— Date: !a Report No.: <br /> Project Name: Ln? ff"ri Project Location: 11 X / <br /> Client: Temp/Weather: /" Z <br /> Project Manager: L ® j Va vet 14-L I Time Arrived: = 00W Departed: _l <br /> -f <br /> 4 .. ' <br /> 3 <br /> Compaction Testing Concrete Testing Cylinder Pickup ❑ Proctor Pickup ❑ Masonry Pickup <br /> ❑ DCP ❑ Other(describe) <br /> Areas Tested: ❑ Mass Grading O Building Pad O Wall Backfill ❑ Slab Subgrade ❑ Parking/Walks <br /> Utilities ❑ Roadways ❑ Bituminous ❑ Other(describe) <br /> Method: X Nuclear ❑ Sandcone I #of tests: Fill Source: On-site ❑ Imported <br /> Tests taken met specification? ❑ Yes ❑ No Waiting on Proctor results? <br /> Contractor notified of test results? 0 Yes O No Name of person notified: <br /> Areas Tested: ❑ Footing Slab on Grade ❑ Deck O Columns/Piers ❑ Walls <br /> O Pile Cap/Pile Fill ❑ Pavement ❑ Curb&Gutter ❑ Other(describe) <br /> No. of placements: ! Yards per placement: Method of placement: <br /> Set# Cylinder Size Air% Slump Temp Mix Supplier Spec.Strength Workorder# <br /> �'• .Z.a � ' <br /> Contractor notified of test results? O Yes O No, Name of person notified: <br /> v '.max ..x16. �..; i 3 .•ti .a� <br /> ..\ � :� 1+. M_. SLK xs5 <br /> Was everything available to test/observe? Yes ❑ No Were there any delays? (Explain below if yes) Yes O No <br /> Was a copy of this report left on site? Yes O No If so,whom was it submitted to: e <br /> Comments <br /> �r �.0 <br /> Performed By: 105.s Reviewed by: Date: <br /> This is a preliminary report and is provided solely as evidence that field observations and/or testing was performed. Observations and/or conclusions <br /> and/or recommendations conveyed in the final report may vary from,and shall take precedence,over those indicated in a preliminary report. <br /> Providing engineering and environmental soludons since 1957 <br />