Laserfiche WebLink
Page I ofl_ <br /> SIDRPT Rev 1 o/o9 <br /> BRAUN <br /> I NTE RTEC Special Inspection Daily Report <br /> City of ANQ <br /> Report No.: Date of This Report: 8-24 -l® <br /> Project Name: Ori 4-,Qdl}i�1`K Project No.: j, 0C.- 7—0-7 q G <br /> ti <br /> Project Address: <br /> Client: Client Project No.: <br /> Project Manager: V Temp/Weather: G 170 <br /> Type of Inspection: Inspection Coverage: <br /> ❑ Continuous ❑ Masonry ;?"Rebar Placement ❑ Foundations ❑ Special Cases <br /> Periodic ❑ Welding& Bolting ❑ Concrete Placement ❑ Fireproofing <br /> ❑ Piles& Piers ❑ Tendon Placement ❑ Soils <br /> Did the architect or engineer authorize changes to city approved plans? Yes ❑ (Listed Below) No <br /> Description and location of work completed: �PO 1 ba I IV) <br /> l NyL <br /> MOiWu,t,\ G ew,-,l6ed Atn f- <br /> 0CyA-) A- � v4� 4v cAC,� <br /> List tests performed: <br /> • Are there any discrepancies noted from this clay's observations? Yes ❑ No <br /> • Are there any outstanding discrepancies on this project? Yes ❑ No <br /> • If yes,see attached Summary Sheet. <br /> To the best of our knowledge,work inspected was done in accordance with the approved plans,specifications and applicable <br /> workmanship provisions of the current IBC,except as noted above. <br /> Signed: /1.� /�„ Date: <br /> Print Full Name: �/�{--� (C ; I.D. No.: <br /> White copy to Braun Intertec file. Yellow copy to Project Site Representative. <br /> 4 Providing engineering and environmental solutions since 1957 <br />