Laserfiche WebLink
Page L of <br /> BRAUN SIDRPT Rev i mg <br /> I NTE BTEC Special Inspection Daily Report <br /> City of I�fnv�a <br /> Report No.: S j�f,� �1 Sw\'h r Date of This Report: <br /> Project Name: ( Ek" a a '; i } Project No.: <br /> Project Address: <br /> Client: 10AA Client Project No.: <br /> &Project Manager: �1�s{n`�a1.. ej Temp/Weather: 46VIP <br /> �T <br /> Type of Inspection: Inspection Coverage: <br /> ❑ Continuous ❑ Masonry ❑ Rebar Placement <br /> ❑ Foundations ❑ Special Cases <br /> -Peri ic----------- .We .....❑..... <br /> ...Fir'eproofing.....-..........................-.:--:.... _. ....lding...&-Boltin9. Concrete Plotertent . <br /> ❑ <br /> Piles&Piers ❑ Tendon Placement ❑ Soils <br /> Did the architect or engineer authorize changes to city approved plans? Yes ❑ (Listed Below) No ❑ <br /> Description and location of work completed: <br /> Kcker A-C utdc1`�'�- ,mss „ .ret„ - R, �n►ae l <br /> �o�\o.ati'J <br /> CIS A3asi O_AA _ C,OA^W' SL <br /> • Are there any discrepancies noted from this day's observations? Yes ❑ No <br /> • Are there any outstanding discrepancies on this project? Yes ❑ No <br /> • If yes,see attached Summary Sheet. <br /> To the best of our knowledge,Work inspected was done in accordance with the approved plans,specifications and applicable' <br /> Workmanship provisions of the current IBC,except as noted above. <br /> Signed: Date: Q � . <br /> Print Full Name: I.D. No.: <br /> White copy to Braun Intertec file. Yellow copy to Project Site Representative. <br /> Providing engineering and environmental sdumm since 1957 <br />