Laserfiche WebLink
Orono Elementary and Intermediate School Phase II Renovations <br /> Plumbing <br /> Plan No. 096475 <br /> Page 4 <br /> April 13, 2009 <br /> f. Area F-Replace four multi-user wash fountains,two electric water coolers, four urinals,eight water <br /> closets,and four sinks.Provide six floor drains,three lavatories,Iwo water closets,and one sink. <br /> Relocate the domestic water mains to the main level. <br /> g. Area G-Replace one multi-user wash fountain,one electric water cooler,two water closets,one mop <br /> sink,and eight sinks.Provide one floor drain,one multi-user was fountain,two water closets,two <br /> urinals, four hose bibs, and one sink.Relocate the domestic watei mains to the main level. <br /> 2. This facility is served by existing municipal sewer and water services <br /> Authorization for construction in accordance with the approved plans maybe withdrawn if construction is not <br /> undertaken within a period of two years. The fact that the plans have bee approved does not necessarily mean <br /> that recommendations or requirements for change will not be made at som later time when changed conditions, <br /> additional information,or advanced knowledge make improvements neces 3ary. <br /> Approved: <br /> Scott A. Sawyer,P.E. <br /> Public Health Engineer <br /> Plumbing Plan Review and Inspections Unit <br /> 443 Lafayette Road North <br /> St.Paul,Minnesota 551554343 <br /> 651/284-5803 <br /> SAS:ss <br /> Enclosure <br /> cc: Karges-Faulconbridge,Inc. <br /> Independent School District No.278 <br /> Mr.Malvin Wurzer,Building Official <br /> File a/ <br />