4 <br /> 1 <br /> t <br /> MINNESOTA DEPARTMENT OF HEALTH <br /> Division of Environmental Health <br /> REPORT ON PLANS <br /> Plans and specifications on plumbing: Orono Student Center Addition and Remodeling, 770 Old Crystal Bay <br /> Road, Orono, Hennepin County, Minnesota, Plan No. 931571 <br /> Submitted by: EOS Corporation, 470 Water Street, Excelsior, Minnesota 55331 <br /> Ownership: Independent School District No. 278, c/o Mr. Thomas Mich, Superintendent, 685 Old Crystal Bay <br /> Road, Long Lake, Minnesota 55356 <br /> Date Examined: April 6, 1993 Date Received: April 2, 1993 <br /> SCOPE: This examination is limited to the design of this particular project only insofar as the provisions of the <br /> Minnesota Plumbing Code, as amended, apply, and does not cover the water supply or sewerage system to <br /> which this plumbing system is connected. The examination of plans is based upon the supposition that the data <br /> on which the design is based are correct, and that necessary legal authority has been obtained to construct the <br /> project. The responsibility for the design of structural features and the efficiency of equipment must be taken by <br /> the project designer. Approval is contingent upon satisfactory disposition of any requirements Included in this <br /> report. <br /> INSPECTIONS: Special care should be taken to insure that the material and installation of the plumbing system <br /> are in accordance with the provisions of the Minnesota Plumbing Code. It is necessary that the State Health <br /> Department make roughing-in and final inspections of the plumbing system to determine whether it complies <br /> with the code. Provisions should be made for applying an air test at the time of the roughing-in inspection as <br /> outlined in Minn. Rules, p. 4715.2820, of the code. In order to facilitate this work, a self-addressed card is <br /> attached which should be returned to this office. The name of the plumbing contractor should be indicated so <br /> arrangements can be made for the contractor to notify the State Health Department that the installation will be <br /> ready for a test and inspection. <br /> No acceptance of the plumbing installation can be given until inspection and testing of the roughing-in work <br /> (Minn. Rules, p. 4715.2820, subp. 2), finished plumbing (Minn. Rules, p. 4715.2820, subp. 3), and inspection of <br /> the completed installation by a representative of the State Health Department indicates compliance with the <br /> provisions of the code. <br /> REQUIREMENTS: <br /> 1. Plastic pipe must be installed in accordance with Minn. Rules, p. 4715.0580(f) and p. 4715.0600. Horizontal <br /> runs of plastic waste and vent pipe above-grade cannot exceed 35 feet in total length. Vertical runs of <br /> plastic waste and vent pipe above-grade may only exceed 35 feet in total height with an approved <br /> expansion joint. <br /> 2. Solvent weld joints in PVC and CPVC pipe must include use of a primer which is of contrasting color to the <br /> pipe and cement (see Minn. Rules, p. 4715.0810, subp. 2). <br /> 3. The three-compartment sink must be trapped and vented at the central compartment. <br /> Authorization for construction in accordance with the approved plans may be withdrawn if construction is not <br /> undertaken within a period of two years. The fact that the plans have been approved does not necessarily mean <br /> that recommendations or requirements for change will not be made at some later time when changed <br /> conditions, additional information, or advanced knowledge make improvements necessary. <br /> Aproved: <br /> Lew1 y <br /> is E. Ande on <br /> Public Health Engineer <br /> Section of Water Supply <br /> and Well Management <br /> 612/627-5120 <br /> s <br />