Laserfiche WebLink
PAGE 07 <br /> VIKING AUTOMATIC SPRINKLER CO. <br /> ORONO SCHOOL <br /> --------------------------------------- <br /> Q DEMAND <br /> SYSTEM FLOW = 306.63 GPM <br /> 0 STATIC 1 INSIDE HOSE = 0.00 GPM <br /> OUTSIDE HOSE = 100.00 GPM <br /> RACK — 0.00 0 GPM <br /> ----------- <br /> 1 TOTAL FLOW DEMAND = 406.63 GPM <br /> TOTAL PRESS DEMAND = 52. 120 PSI <br /> * RESIDUAL 1 ELEVATION = 0.000 FT. <br /> i------------------------------------- <br /> WATER SUPPLY DATA <br /> PRESS C DEMAND <br /> i " . I <br /> I STATIC PRESS = 59.500 PSI <br /> SYSTEM *P f RES I D. PRESS = 20.000 PSI <br /> DEMAND v , RESID FLOW = 2050.00 GPM <br /> ----- Q FLOW Q i-------------- <br /> TOTAL . -DEMAND t CALCULATED DATA <br /> r DEMAND <br /> 1 PRESS C DEMAND = 57.519 PSI <br /> I FLOW C DEMAND — 827.84 GPM <br /> FLOW @ # *P — 5. 99 PSI <br /> ELEVATION 20 PSI a *q = 421 .21 GPM- <br /> 1 FLOW AVAIL @ <br /> 20.000 PSI = 2049.99 GPM <br />