My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Proposal requests
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Proposal requests
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:04 PM
Creation date
2/27/2018 11:48:25 AM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ " • ' • REQUESTBq <br /> y <br /> PROJECT: ISD #278 District OffiGe.ExpansionWOLD ARCIU=AM ENGM <br /> - _ _ <br /> F92W <br /> Orono. MN 305 ST PUM MM <br /> ST.PAUL,MN 55101.TO: Oakwood Builders, Inc. PAX 651.223.5646 TR.: 651.227.7773 <br /> 0 12901 Pioneer Trail 25 SOUTH GROVE;.VENUE,SUITE Soo <br /> ELGIN,IL 60120 <br /> Eden Prairie, MN 55347 - _ FAX 847.608.2654 TEL• 847.608.2600 <br /> Attn: Randal Gunningham/Andrew McIntosh __ <br /> SUBMIT AN ITEMIZED(LABOR AND MATERIAL)QUOTATION FOR THE PROPOSED <br /> MODIFICATIONS TO THE CONTRACT DOCUMENTS AS DESCRIBED HEREIN WITHIN 2I PR: # _ 12 <br /> JAN 2 4 ?QCL DAYS OF RECEIPT. IF A COST IS NOT SUBMITTED WITHIN 21 DAYS,THIS PROPOSAL COMM: # 01088 _ <br /> REQUEST CAN BE ACCEPTED AT NO ADDITIONAL COST. WRITTEN APPROVAL IS CONST.PKG: <br /> CITY yr UfiONO REQUIRED PRIOR TO PROCEEDING WITH THIS CHANGE. <br /> COST EXPECTATIONS: ❑DEDUCT ONO COST ■ADD <br /> DISTRIBUTION: ITEM: DESCRIPTION: <br /> ❑ Neal Lawson I50 278 <br /> O John Ostlund. ISD 278 — — _ <br /> O GFris Plessel.6KBM <br /> ❑ Lyle Gran.Olt of Orxso --___—_-_- ----------_— --- ---- — — <br /> ❑ BIII Meger.Glt of Orono 1. Revise ductwork plan per F5K 52 Relocate existing speaker conduit (1) as <br /> ❑ 5cott McQueen required. Goordinate with electrical <br /> ❑ Kevin Marshall <br /> ClKevi sh 2. Provide additional steel support For RTU-1 per F5K 53 <br /> Brici❑ Teorinie Nielsen <br /> ❑ 3. Remove and replace ceilings in rooms A128 and A129 at 8'-0" Disconnect <br /> ❑ and reconnect lighting and other electrical devices as required <br /> ❑ File #01088 <br /> ATTAcmmmS: FSK 52 and 53. <br /> ISSUED BY: Vau hn Dierks DATE: January 14, 2002 <br /> WOLD ARCHITECTS AND ENGINEERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.