Laserfiche WebLink
~ " • ' • REQUESTBq <br /> y <br /> PROJECT: ISD #278 District OffiGe.ExpansionWOLD ARCIU=AM ENGM <br /> - _ _ <br /> F92W <br /> Orono. MN 305 ST PUM MM <br /> ST.PAUL,MN 55101.TO: Oakwood Builders, Inc. PAX 651.223.5646 TR.: 651.227.7773 <br /> 0 12901 Pioneer Trail 25 SOUTH GROVE;.VENUE,SUITE Soo <br /> ELGIN,IL 60120 <br /> Eden Prairie, MN 55347 - _ FAX 847.608.2654 TEL• 847.608.2600 <br /> Attn: Randal Gunningham/Andrew McIntosh __ <br /> SUBMIT AN ITEMIZED(LABOR AND MATERIAL)QUOTATION FOR THE PROPOSED <br /> MODIFICATIONS TO THE CONTRACT DOCUMENTS AS DESCRIBED HEREIN WITHIN 2I PR: # _ 12 <br /> JAN 2 4 ?QCL DAYS OF RECEIPT. IF A COST IS NOT SUBMITTED WITHIN 21 DAYS,THIS PROPOSAL COMM: # 01088 _ <br /> REQUEST CAN BE ACCEPTED AT NO ADDITIONAL COST. WRITTEN APPROVAL IS CONST.PKG: <br /> CITY yr UfiONO REQUIRED PRIOR TO PROCEEDING WITH THIS CHANGE. <br /> COST EXPECTATIONS: ❑DEDUCT ONO COST ■ADD <br /> DISTRIBUTION: ITEM: DESCRIPTION: <br /> ❑ Neal Lawson I50 278 <br /> O John Ostlund. ISD 278 — — _ <br /> O GFris Plessel.6KBM <br /> ❑ Lyle Gran.Olt of Orxso --___—_-_- ----------_— --- ---- — — <br /> ❑ BIII Meger.Glt of Orono 1. Revise ductwork plan per F5K 52 Relocate existing speaker conduit (1) as <br /> ❑ 5cott McQueen required. Goordinate with electrical <br /> ❑ Kevin Marshall <br /> ClKevi sh 2. Provide additional steel support For RTU-1 per F5K 53 <br /> Brici❑ Teorinie Nielsen <br /> ❑ 3. Remove and replace ceilings in rooms A128 and A129 at 8'-0" Disconnect <br /> ❑ and reconnect lighting and other electrical devices as required <br /> ❑ File #01088 <br /> ATTAcmmmS: FSK 52 and 53. <br /> ISSUED BY: Vau hn Dierks DATE: January 14, 2002 <br /> WOLD ARCHITECTS AND ENGINEERS <br />