Laserfiche WebLink
B. Visual and Mechanical Inspection: Include the following inspections and related work: <br /> 1. Inspect for defects and physical damage. <br /> 2. Exercise and perform operational tests of all mechanical components and other operable devices in accordance <br /> with manufacturer's instruction manual. <br /> 3. Check mounting,area clearances,and alignment and fit of components. <br /> 4. Check tightness of bolted electrical connections, including grounding connections. Refer to manufacturers <br /> written instructions for proper torque values. <br /> 5. Perform visual and mechanical inspection and related work. <br /> C. Electrical tests: Prepare for acceptance tests and include the following items performed in accordance with <br /> manufacturer's written instructions: <br /> 1. Insulation resistance test of each component,connecting supply,and portions of control wiring that disconnect <br /> from solid-state devices through normal disconnecting features. <br /> 2. Ground resistance test on equipment ground connections. <br /> 3. Continuity tests of each circuit. <br /> D. Re-test: Correct deficiencies identified by tests and observations and provide re-testing. Verify by the system tests <br /> that the total assembly meets specified requirements. <br /> 3.06 CLEANING <br /> A. Upon completion of installation, inspect interior and exterior of switchboards and panelboards. Remove paint <br /> splatters and other spots,dirt, and debris. Touch up scratches and mars of finish to match original finish. <br /> END OF SECTION 16478 <br /> 16478-6 No. 01088 <br />