My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-19-2017 Planning Commission Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
2010-2019
>
2017
>
06-19-2017 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2018 11:00:08 AM
Creation date
2/23/2018 11:00:03 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE <br /> ORONO PLANNING COMMISSION MEETING <br /> Monday,June 19,2017 <br /> 6:30 o'clock p.m. <br /> uses such as retail, an apartment building or a restaurant. Barnhart stated the majority of traffic in the <br /> Navarre area comes from the south. <br /> Other buildings in the area include the Freshwater Business Center, Culver's,Narrow's Bar and Saloon, <br /> and Shadywood Villas,which was approved last year. Access to this site is proposed off of a new shared <br /> driveway with the Freshwater Business Center. This driveway will line up with the driveway serving the <br /> church across Shadywood Road. Hennepin County supports the offset. <br /> The building is proposed to be 35 feet back from the Shadywood Road right-of-way line and about 35 feet <br /> from the new side lot line to the north. This has not been verified with an updated survey or site plan. <br /> The lot requires a 50-foot setback from the front yard and a 35-foot setback from the side yard. The <br /> building will also need to be 85 feet from the wetland. <br /> The applicant has provided some additional information regarding the residential properties located to the <br /> rear of the proposed building. <br /> Barnhart displayed a cross section of the building and noted that from the east side it will appear to be a <br /> 5-story building. The penthouse is set to the east of the building so it is not as close to the Shadywood <br /> side as it could be. <br /> Barnhart displayed a colored sketch of the exterior of the building and an aerial of the nearby residences. <br /> A number of comments regarding the project have been received. <br /> The applicant is also proposing to modify a portion of the shared property line between the proposed <br /> condominium lot and the lot containing the Freshwater Business Center. A boundary line adjustment is a <br /> minor administrative action but does impact lot size, setbacks, structural coverage, and density <br /> calculations. <br /> Staff has not reviewed the grading and drainage plan in detail but the plan depicts holding ponds. A <br /> Conservation Design plan will need to be completed. <br /> Staff is recommending tabling the application to allow for the submittal of certain information related to <br /> the rezoning request. The applicant is requesting that public comments be received and that the Planning <br /> Commission make a recommendation so the plan can proceed forward to the City Council. <br /> Thiesse asked if the hardcover will go beyond the 50 percent if it is rezoned to RPUD. <br /> Barnhart stated the proposed hardcover is at 36 percent and they would be allowed up to 50 percent. Any <br /> amount over 50 percent would require a variance as well as mitigation. <br /> Thiesse asked if the City is protecting the neighborhood by allowing condominiums rather than any other <br /> use on this site. <br /> Barnhart stated the applicant has changed his proposal from an apartment building to condominiums <br /> following a neighborhood meeting. Barnhart noted the traffic numbers were provided by ITE. <br /> Lemke asked what Staff believes are the main issues. <br /> Page 8 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.