Laserfiche WebLink
Fees to be Charged YES N <br /> Permit <br /> Plan Review <br /> State Surcharge <br /> Investigation Fee <br /> t �' Y <br /> Other(specify) <br /> Square Footage $ per Square Footage <br /> Basement X = $ <br /> 1st Floor X = $ <br /> 2nd Floor X = $ <br /> Garage X = $ <br /> F) <br /> Estimated Construction Value: $ WO <br /> Orono Inspections Required Work Requiring Separate Permits <br /> ❑ Footing ❑ Site Plumbing 0 Grading/Filling <br /> O Poured Wall 0 Silt Fence/Erosion Control X,Mechanical ❑ Fire <br /> O Foundation Survey I] Hardcover Removal 0 Fireplace ❑ Water Connection <br /> ❑ Framing I] Other(specify) 0 Masonry 0 Sewer Connection <br /> ❑ Waterproofing/Drain tile 0 Mfg. 0 Lawn Irrigation <br /> ❑ Foundation Waterproofing 0 Other(specify) 0 Landscaping <br /> raming 0 Septic <br /> Insulation <br /> ❑ As-Built Survey <br /> 'nal <br /> ❑ Lathe Required State Permits <br /> ❑ Other(specify) <br /> 0 Well etc Electrical <br /> REMARKS (in-house): <br /> OFFICIAL REMARKS -TO BE NOTED ON PERMIT AND INITIALLED: <br /> ❑ See Builder Acknowledgement Form <br /> O Prior to release of escrow money an as-built survey and hardcover calculations must be submitted and approved. <br /> Updated: June 2017 <br /> z:\forms\plan review checklist 06-2017.docx <br />