My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: open bldg permits
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Correspondence
>
Re: open bldg permits
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:05 PM
Creation date
2/22/2018 2:24:21 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Correspondence
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'to My Favorite City Planner- <br /> I will be willing to show your building inspector these structures at anytime. Please let me know who I need to <br /> call and we will get these items closed out. <br /> I agree, it would be nice to have all these closed out. Moving forward I will do a better job of calling to <br /> schedule inspections. <br /> Are yous till open to looking at a re-zoning of the school district property to institutional? If so, I'd love to <br /> come up with a proposal. <br /> Justin <br /> On Mon, Apr 28, 2014 at 7:11 PM, Melanie Curtis <MCurtis@ci.orono.mn.us>wrote: <br /> Justin <br /> Thank you for the tour last week. It was very helpful to give me a perspective on the improvements you've made to the <br /> property. The property looks great! <br /> Now that I understand better what the status is of each of the various projects, I have a couple thoughts on the existing <br /> and upcoming or on-going projects. Please see the status report below. Each of the open permits has a status note <br /> regarding what inspections are needed, follow up, etc. <br /> I think we can agree the CUP and building permit for the athletic field from 2008 should be finalized. I will make the <br /> appropriate notes in our file so that it can be closed out and that $2,500 escrow released. I think the same could be said <br /> for the softball field construction. <br /> However, the building permits for the sheds somehow did not receive any inspections. I think it would be good to have <br /> our inspector check these structures so that we can close the appropriate files in our system and stay on top of the active <br /> permits moving forward. It is a requirement of the permit that, while the sheds/buildings are under construction, you or <br /> your contractor could contact the City at the appropriate times to have the footing, framing, and final inspections <br /> completed. Because the school property is so far removed, at least visibly, from the public view it is difficult for our <br /> inspectors to keep an eye on current projects and when inspection requests should be expected. I am open to <br /> suggestions on how we can better work proactively with you on this. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.