Laserfiche WebLink
ESTIMATED WORK SCHEDULE/TIMELINE <br /> Task People Estimated Estimated <br /> Needed Hours Date <br /> Shop Work(Whole Team at WDR) 10 Scouts 3 Hours March 27 <br /> Group 1 (5 people):Create tower sections 3 Adults <br /> Group 2 (2 people): Build frame for roof of kiosk <br /> Group 3 (3 people):Construct kiosk display panels <br /> Shop Work after break(Whole Team at WDR) 10 Scouts 2 Hours March 27 <br /> All people: Cut all other wood and organize for 3 Adults <br /> site delivery <br /> Foundation (on site) 5 Scouts 3 Hours April 2rd or <br /> Build Foundation form 2 Adults 9th <br /> Set corner posts for kiosk <br /> Install tower bottom section <br /> Pour concrete <br /> Install rest of Tower(on site) 10 Scouts 5 Hours April 4h or <br /> install section#2, 3 Adults lit, <br /> install kiosk roof. <br /> Install section#3, <br /> install tower top, <br /> install insulation and sheathing, <br /> install predator guard, <br /> install kiosk display panels. <br /> TOTALS: 10 Scouts 115 Hours Scouts March 27— <br /> 3 Adults 39 Hours Adults April 11 <br /> Outside: We plan to have water and snacks available for the workers while working on the project. <br /> Tools needed: <br /> • hammer <br /> • Lumber Crayon <br /> • Carpenter's Square <br /> • Framing Level <br /> • Hacksaw <br /> • Circular Saw <br /> • Power Screwdrivers <br /> • Table Saw <br /> • Cement Mixer(or use wheelbarrow) <br /> Derek Meyer Eagle Project—Chimney Swift Tower for Orono Intermediate School 7 <br />