My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: eagle sxout project
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Correspondence
>
Re: eagle sxout project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:04 PM
Creation date
2/22/2018 2:10:33 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Correspondence
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ESTIMATED WORK SCHEDULE/TIMELINE <br /> Task People Estimated Estimated <br /> Needed Hours Date <br /> Shop Work(Whole Team at WDR) 10 Scouts 3 Hours March 27 <br /> Group 1 (5 people):Create tower sections 3 Adults <br /> Group 2 (2 people): Build frame for roof of kiosk <br /> Group 3 (3 people):Construct kiosk display panels <br /> Shop Work after break(Whole Team at WDR) 10 Scouts 2 Hours March 27 <br /> All people: Cut all other wood and organize for 3 Adults <br /> site delivery <br /> Foundation (on site) 5 Scouts 3 Hours April 2rd or <br /> Build Foundation form 2 Adults 9th <br /> Set corner posts for kiosk <br /> Install tower bottom section <br /> Pour concrete <br /> Install rest of Tower(on site) 10 Scouts 5 Hours April 4h or <br /> install section#2, 3 Adults lit, <br /> install kiosk roof. <br /> Install section#3, <br /> install tower top, <br /> install insulation and sheathing, <br /> install predator guard, <br /> install kiosk display panels. <br /> TOTALS: 10 Scouts 115 Hours Scouts March 27— <br /> 3 Adults 39 Hours Adults April 11 <br /> Outside: We plan to have water and snacks available for the workers while working on the project. <br /> Tools needed: <br /> • hammer <br /> • Lumber Crayon <br /> • Carpenter's Square <br /> • Framing Level <br /> • Hacksaw <br /> • Circular Saw <br /> • Power Screwdrivers <br /> • Table Saw <br /> • Cement Mixer(or use wheelbarrow) <br /> Derek Meyer Eagle Project—Chimney Swift Tower for Orono Intermediate School 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.