My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Mech/Elect project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Mech/Elect project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:04 PM
Creation date
2/22/2018 2:03:43 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.10 FIELD QUALITY CONTROL ' <br /> A. Inspections: Inspect water distribution piping as follows: <br /> 1. Do not enclose, cover, or put into operation water distribution piping system until it has been inspected and t <br /> approved by the authority having jurisdiction. <br /> 2. During the progress of the installation,notify the plumbing official having jurisdiction at least 24 hours prior ' <br /> to the time such inspection must be made. Perform tests specified below in the presence of the plumbing <br /> official. <br /> a. Rough-in Inspection: Arrange for inspection of the piping system before concealed or closed in after ' <br /> system is roughed in and prior to setting fixtures. <br /> b. Final Inspection: Arrange for a final inspection by the plumbing official to observe the tests specified <br /> below and to ensure compliance with the requirements of the plumbing code. <br /> 3. Reinspection: Whenever the plumbing official finds that the piping system will not pass the test or <br /> inspection,make the required correction and arrange for reinspection by the plumbing official. <br /> 4. Reports: Prepare inspection reports signed by the plumbing official. <br /> B. Test water distribution piping as follows: <br /> 1. Test for leaks and defects all new water distribution piping systems and parts of existing systems that have , <br /> been altered,extended or repaired If testing is performed in segments,submit a separate report for each test, <br /> complete with a diagram of the portion of the system tested <br /> 2. Leave uncovered and unconcealed all new,altered,extended,or replaced water distribution piping until it has <br /> been tested and approved Expose all such work for testing that has been covered or concealed before it has <br /> been tested and approved <br /> 3. Cap and subject the piping system to a static water pressure of 50 psig above the operating pressure without , <br /> exceeding the pressure rating of the piping system materials. Isolate the test source and allow to stand for 4 <br /> hours. Leaks and loss in test pressure constitute defects that must be repaired ' <br /> 4. Repair all leaks and defects with new materials and re-test system or portion thereof until satisfactory results <br /> are obtained <br /> 5. Prepare reports for all tests and required corrective action. <br /> 3.11 ADJUSTING AND CLEANING t <br /> A. Clean and disinfect water distribution piping as follows: <br /> 1. Purge all new water distribution piping systems and parts of existing systems that have been altered,extended, ' <br /> or repaired prior to use. <br /> 2. Use the purging and disinfecting procedure proscribed by the authority having jurisdiction or,in case a method , <br /> is not prescribed by that authority, the procedure described in either AWWA C651, or AWWA C652, or as <br /> described below: <br /> a. Flush the piping system with clean,potable water until dirty water does not appear at the points of outlet. ' <br /> b. Fill the system or part thereof with a water/chlorine solution containing at least 50 parts per million of <br /> chlorine. Isolate(valve oft)the system or part thereof and allow to stand for 24 hours. ' <br /> 15411-10 No.99132-CP2 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.