My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Mech/Elect project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Mech/Elect project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:04 PM
Creation date
2/22/2018 2:03:43 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.04 SYSTEM DESCRIPTION ' <br /> A. Fire protection system is a "Wet-Pipe" system employing automatic sprinklers attached to a piping system <br /> containing water and connected to a water supply so that water discharges immediately from sprinklers opened by <br /> fire. <br /> 1.05 WORK SCOPE <br /> A. Describe Work Scope for each project. <br /> 1.06 SUBMITTALS <br /> A. Upon substantial completion of the piping layout and hydraulic calculations,submit a reproducible drawing and one <br /> set of prints and calculations to the Engineer for review prior to completing the submittal. The Engineer will review <br /> the piping layout and return a print marked to show changes required before the final submittal is made. <br /> B. The final shop drawing submittal shall be in accordance with the UBC and shall include full size drawings of the <br /> complete piping and head layout indicating sprinkler zones, area hazard ratings, piping material, head types and <br /> method of hanging,hydraulic calculations for each zone, all product data, and welders certificates. The hydraulic <br /> calculations must prove the remote area for each zone. Submit supplemental calculations for all non-typical areas. <br /> C. Upon completion of the shop drawings, submit to the reviewing agencies for approval. The reviewing authorities , <br /> may include the following: <br /> 1. State Fire Marshall 11 <br /> 2. City/Local Fire Marshall <br /> 3. Health and Building Department <br /> D. Submit one set of shop drawings to the Owner's insurance carrier. <br /> E. Submit seven(7)copies of the shop drawing submittal to the Engineer. Two(2)of the seven(7)copies submitted <br /> shall be stamped"approved"by each of the reviewing agencies. "Approved"copies submitted shall include copies <br /> of the agencies reviewer comments. <br /> F. The drawings must be stamped and signed by a Professional Engineer registered in the State of Minnesota. , <br /> G. Upon substantial completion of the project, submit contract closeout submittals to include two sets of as-builts <br /> drawings,operating and maintenance manuals,as-built hydraulic calculations,and"Material and Test Certificates" <br /> for above and below ground piping. <br /> H. As built hydraulic calculations must be submitted to prove remote area criteria is met with all included field <br /> modifications. , <br /> 1.07 QUALITY ASSURANCE <br /> A. Installer Qualifications: Installation and alterations of fire protection piping, equipment, specialties, and ' <br /> accessories, and repair and servicing of equipment shall be performed only by a qualified installer. The term <br /> qualified means experienced in such work(experienced shall mean having a minimum of 5 previous projects similar <br /> in size and scope of this project),familiar with all precautions required,and has complied with all the requirements <br /> of the authority having jurisdiction. Upon request,submit evidence of such qualifications to the Architect. Refer to <br /> Division 15 Section: "Reference Standards and Definitions"for definitions for"Installers". <br /> B. Qualifications for Welding Processes and Operators: Comply with the requirements of AWS D10.9, <br /> "Specifications for Qualifications of Welding Procedures and Welders for Piping and Tubing,Level AR-3." <br /> 15300-2 No.99132-CP2 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.