My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Mech/Elect project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Mech/Elect project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:04 PM
Creation date
2/22/2018 2:03:43 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 3.02 INSTALLATION OF PRESSURE GAGES <br /> A. Install pressure gages in piping tee with pressure gage valve,located on pipe at most readable position. <br /> B. Install in the following locations,and elsewhere as indicated: <br /> 1. At suction and discharge of each pump. <br /> ' 2. At inlet and discharge of each pressure-reducing valve. <br /> 3. At building water service entrance. <br /> ® 4. At chilled water and condenser water inlets and outlets of chillers. <br /> ' 5. At inlet and outlet of each hydronic boiler. <br /> 6. At discharge of each air compressor. <br /> C. Pressure Gage Needle Valves: Install in piping tee with snubber. Install syphon in lieu of snubber for steam <br /> ' pressure gages. <br /> 3.03 INSTALLATION OF TEST PLUGS <br /> ' A. Test Plugs: Install in piping tee where indicated,located on pipe at most readable position. Secure cap. <br /> 3.04 INSTALLATION OF FLOW-MEASURING ELEMENTS AND METERS <br /> A. General: Install flow meters for piping systems located in accessible locations at most readable position. <br /> B. Locations: Install flow measuring elements and meters in the following locations and elsewhere as indicated. <br /> 1. At inlet of each hydronic coil in air handling units and built-up central systems. <br /> ' 2. At outlet from each hydronic zone. <br /> C. Differential-Pressure-Type Flow Elements: Install minimum straight lengths of pipe upstream and downstream <br /> from element as prescribed by the manufacturer's installation instructions. <br /> ' D. Install wafer orifice-type element between (2) Class 125 pipe flanges, ANSI B16.1 (cast iron) or ANSI B16.24 <br /> (bronze). <br /> ' E. Install connections for attachment to portable flow meters in a readily accessible location. <br /> F. Meters For Use With Flow Elements: Install meters on wall or bracket in accessible location. <br /> G. Install connections,tubing,and accessories between flow elements and meters as prescribed by the manufacturer's <br /> installation instructions. <br /> r3.05 ADJUSTING AND CLEANING <br /> A. Adjusting: Adjust faces of meters and gages to proper angle for best visibility. <br /> B. Cleaning: Clean windows of meters and gages and factory-finished surfaces. Replace cracked and broken <br /> windows,and repair scratched and marred surfaces with manufacturer's touch-up paint. <br /> 15135-7 No.99132-CP2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.