My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Mech/Elect project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Mech/Elect project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:04 PM
Creation date
2/22/2018 2:03:43 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 15010 <br /> BASIC MECHANICAL REQUIREMENTS <br /> PART 1: GENERAL <br /> 1.01 RELATED DOCUMENTS <br /> j� A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 <br /> Specification sections,apply to this and all other sections of Division 15. <br /> 1.02 SCOPE <br /> A. All work shall conform in all respects with the requirements of these contract documents. All labor shall be <br /> performed by laborers skilled in their respective trades. <br /> B. It is the intent of these contract documents to form a guide for a complete installation. Everything necessary for a <br /> complete and successful installation of work shall be provided. <br /> C. This Section includes general administrative and procedural requirements for mechanical installations. The <br /> following administrative and procedural requirements are included in this Section to expand the requirements <br /> specified in Division 1: <br /> 1. Description of work <br /> 2. Interpretation of plans <br /> 3. Submittals <br /> 4. Coordination drawings <br /> 5. Record documents <br /> 6. Maintenance manuals <br /> 7. Delivery,storage and handling <br /> 8. Fire safety precautions <br /> 9. Personal safety requirements <br /> 10. Demolition <br /> PART 2: PRODUCTS <br /> (Not applicable) <br /> PART 3: EXECUTION <br /> 3.01 DESCRIPTION OF WORK <br /> A. Work included under Division 15 shall consist of fiirmshmg all labor,materials, equipment and services necessary <br /> for the complete installation of all mechanical work shown on drawings and specified within. In general, this <br /> includes all plumbing, heating, ventilation, air conditioning, fire protection and building temperature <br /> control/automation systems. <br /> B. Include all minor items which are necessary to complete the installation even though not specifically mentioned in <br /> the Contract Documents. Such items include anchors, brackets, sleeves, piping drains, air vents, valves, steam <br /> condensate drip assemblies. <br /> 15010-1 No.99132-CP2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.