My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Mech/Elect project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Mech/Elect project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:04 PM
Creation date
2/22/2018 2:03:43 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' PART 3: EXECUTION <br /> 3.01 INSPECTION <br /> ' A. Examine areas and conditions under which ductwork accessories will be installed. Do not proceed with work until <br /> unsatisfactory conditions have been corrected in manner acceptable to Installer. <br /> 3.02 INSTALLATION OF DUCTWORK ACCESSORIES <br /> A. Install ductwork accessories in accordance with manufacturer's installation instructions,with applicable portions of <br /> details of construction as shown in SMACNA standards, and in accordance with recognized industry practices to <br /> ensure that products serve intended function. <br /> B. Install fuming vanes in square or rectangular 900 elbows in supply and exhaust air systems, and elsewhere as <br /> indicated. <br /> C. Install access doors to open against system air pressure,with latches operable from either side,except outside only <br /> ' where duct is too small for person to enter. <br /> D. Coordinate with other work, including ductwork, as necessary to interface installation of ductwork accessories <br /> properly with other work. <br /> 3.03 FIELD QUALITY CONTROL <br /> A. Operate installed ductwork accessories to demonstrate compliance with requirements. Test for air leakage while <br /> system is operating. Repair or replace faulty accessories, as required to obtain proper operation and leakproof <br /> performance. <br /> 3.04 ADJUSTING AND CLEANING <br /> A. Adjusting: Adjust ductwork accessories for proper settings, install fusible links in fire dampers and adjust for <br /> proper action. <br /> 1. Label access doors in accordance with Division 15 Section 15190 Mechanical Identification. <br /> ' 2. Final positioning of manual dampers is specified in Division 15 Section 15990 Testing, Adjusting, and <br /> Balancing. <br /> B. Cleaning: Clean factory-finished surfaces. Repair any marred or scratched surfaces with manufacturer's touch-up <br /> paint. <br /> ' END OF SECTION 15910 <br /> ' 15910-5 No.99132-CP2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.