My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Mech/Elect project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Mech/Elect project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:04 PM
Creation date
2/22/2018 2:03:43 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Testing: Proof test coils at 300 psi,leak test at 315 psi under water. <br /> 6. Coil Types: Provide the following coil types as indicated,and as scheduled. <br /> a. Steam to 25 psi , 220°F: Provide 1 or 2-raw, 5/8" tubes, same-end connection coil. Provide brazed <br /> tube-to-header joints. <br /> ' PART 3: EXECUTION <br /> 3.01 INSPECTION <br /> A. Examine areas and conditions under which terminal units are to be installed Do not proceed with work until <br /> unsatisfactory conditions have been corrected in manner acceptable to Installer. <br /> 3.02 INSTALLATION OF COILS <br /> A. General: Install coils as indicated,and in accordance with manufacturer's installation instructions. <br /> B. Mount coils on steel supports to form banks or stacks as indicated,brace, secure to air intake chamber. Place in <br /> location to permit installation of bypass damper if required, provide steel baffles where required to prevent <br /> ' bypassing of air. <br /> C. Pitch coil casings for drainage, not less than 1/8" toward return connections, except where drainage feature is <br /> ' included in coil design. <br /> D. Provide for each steam coil unit: Steam supply, condensate return connection, strainer, gate valves, automatic <br /> ' temperature regulating valve,steam traps,as indicated. <br /> 3.03 ADJUSTING AND CLEANING <br /> A. General: After construction is completed, including painting, clean unit exposed surfaces, vacuum clean terminal <br /> coils and inside of cabinets. <br /> ' B. Retouch any marred or scratched surfaces of factory-finished cabinets, using finish materials furnished by <br /> manufacturer. <br /> C. Install new filter units for terminals requiring same. <br /> END OF SECTION 15830 <br /> t <br /> 15830-3 No.99132-CP2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.