My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Mech/Elect project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Mech/Elect project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:04 PM
Creation date
2/22/2018 2:03:43 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 15830 <br /> HEATING TERMINAL UNITS <br /> PART 1: GENERAL <br /> 1.01 RELATED DOCUMENTS <br /> A. The requirements of the following Division 15 sections apply to this section: <br /> ' 1. Section 15050 Basic Mechanical Materials and Methods. <br /> 2. Section 15100 Valves. <br /> 3. Section 15520 Steam and Condensate Piping. <br /> ' 4. Section 15891 Ductwork. <br /> 5. Section 15990 Testing and Balancing. <br /> 1.02 DESCRIPTION OF WORK <br /> A. Extent of terminal unit work is indicated by drawings and schedules,and by requirements of this section. <br /> B. Types of terminal units required for project include the following: <br /> 1. Coils. <br /> ' C. Refer to Division 16 sections for the following work,not work of this section. <br /> 1. Power supply wiring from power source to power connection on terminal unit. Include starters, disconnects, <br /> and required electrical devices,except where specified as finished,or factory-installed,by manufacturer. <br /> 2. Interlock wiring specified as factory-installed is work of this section. <br /> D. Provide the following electrical work as work of this section,complying with requirements of Division 16 sections: <br /> 1. Control wiring between field-installed controls,indicating devices,and terminal unit control panels. <br /> a. Control wiring and interlocks specified as work of Division 15 Section 15970 "Energy Management and <br /> Control System". <br /> 1.03 QUALITY ASSURANCE <br /> A. Codes and Standards: <br /> 1. I=B—R Compliance: Test and rate baseboard and finned tube radiation in accordance with I=B-- <br /> R, provide <br /> published ratings bearing emblem of I=B=R <br /> 2. ARI Compliance: Provide coil ratings in accordance with ARI Standard 410"Forced-Circulation Air-Cooling <br /> and Air-Heating Coils". <br /> ' 3. ASHRAE Compliance: Test coils in accordance with ASHRAE Standard 33 "Methods of Testing Forced <br /> Circulation Air Cooling and Heating Coils". <br /> ' 4. ARI Compliance: Test and rate fan-coil units in accordance with ARI Standard 440 "Room Fan-Coil Air- <br /> Conditioners". <br /> 5. UL Compliance: Construct and install fan-coil units in compliance with UL 883 "Safety Standards for Fan <br /> Coil Units and Room Fan Heater Units. <br /> ' 15830-1 No.99132-CP2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.