My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Mech/Elect project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Mech/Elect project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:04 PM
Creation date
2/22/2018 2:03:43 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Spring hangers to support vertical runs. <br /> C. Install hangers with the following minimum rod sizes and maximums acing: ' <br /> Nom Pipe Size Max.Span-Ft. Min.Rod Size-Inches ' <br /> 1 7 3/8 <br /> 1-1/2 9 3/8 <br /> 2 10 3/8 ' <br /> 3 12 1/2 <br /> 3-1/2 13 1/2 <br /> 4 14 5/8 , <br /> 5 15 5/8 <br /> 6 15 3/4 <br /> D. Support vertical runs at each floor. ' <br /> 3.05 PIPE JOINT CONSTRUCTION <br /> A. Brazed Joints: Comply with the procedures contained in the AWS"Brazing Manual." , <br /> 1. WARNING: Some filler metals contain compounds which produce highly toxic fumes when heated. Avoid <br /> breathing fumes. Provide adequate ventilation. ' <br /> 2. CAUTION: When solenoid valves are being installed, remove the coil to prevent damage. When sight <br /> glasses are being installed, remove the glass. Remove stems, seats, and packing of valves, and accessible <br /> internal parts of refrigerant specialties before brazing. Do not apply heat near the bulb of the expansion valve. <br /> B. Fill the pipe and fittings during brazing, with an inert gas(ie.,nitrogen or carbon dioxide)to prevent formation of <br /> scale. <br /> C. Heat joints using oxy-acetylene torch. Heat to proper and uniform brazing temperature. <br /> 3.06 VALVE INSTALLATIONS <br /> A. General: Install refrigerant valves where indicated,and in accordance with manufacturer's instructions. <br /> B. Install globe valves on each side of strainers and driers,in liquid and suction lines at evaporators,and elsewhere as <br /> indicated. <br /> C. Install a full sized,3-valve bypass around each drier. , <br /> D. Install solenoid valves ahead of each expansion valve and hot-gas bypass valve. Install solenoid valves in <br /> horizontal lines with coil at the top. , <br /> E. Thermostatic expansion valves may be mounted in any position,as close as possible to the evaporator. <br /> 1. Where refrigerant distributors are used,mount the distributor directly on the expansion valve outlet. ' <br /> 2. Install the valve in such a location so that the diaphragm case is warmer than the bulb. ' <br /> 15530-6 No.99132-CP2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.