My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Mech/Elect project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Mech/Elect project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:04 PM
Creation date
2/22/2018 2:03:43 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.05 FIELD QUALITY CONTROL <br /> A. Inspect each installed fixture for damage. Replace damaged fixtures and components. <br /> B. Test fixtures to demonstrate proper operation upon completion of installation and after units are water pressurized. <br /> Replace malfunctioning fixtures and components,then retest. Repeat procedure until all units operate properly. <br /> 3.06 ADJUSTING AND CLEANING <br /> A. Operate and adjust faucets and controls. Replace damaged and malfunctioning fixtures,fittings,and controls. <br /> B. Operate and adjust disposers, hot water dispensers, and controls. Replace damaged and malfimctioning units and <br /> controls. <br /> C. Adjust water pressure at drinking fountains, electric water coolers, and faucets, shower valves, and flushometers <br /> having controls,to provide proper flow and stream <br /> D. Replace washers or cartridges of leaking and dripping faucets and stops. <br /> E. Clean fixtures, fittings, and spout and drain strainers with manufacturers' recommended cleaning methods and <br /> materials. <br /> F. Review the data in Operating and Maintenance Manuals. Refer to Division 1 Section"Project Closeout." <br /> 3.07 PROTECTION <br /> A. Provide protective covering for installed fixtures and fittings. <br /> B. Do not allow use of fixtures for temporary facilities,except when approved in writing by the Owner. <br /> C. Protect interceptors during construction period, to avoid clogging with construction materials and debris, and to <br /> prevent damage from construction debris and traffic. <br /> 3.08 FIXTURE SCHEDULE <br /> A. Provide plumbing fixtures as scheduled on the following"Data Sheets." Each Data Sheet begins with a new page. <br /> 15440-6 No.99132-CP2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.