My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 1 <br /> GENERAL REQUIREMENTS <br /> 01720-PROJECT RECORD <br /> DOCUMENTS <br /> 1. Mark these Drawings to indicate the actual installation where the <br /> installation varies appreciably from the installation shown originally. Give <br /> particular attention to information on concealed elements which would be <br /> difficult to identify or measure and record later. Items required to be <br /> marked include but are not limited to: <br /> a. Dimensional changes to the Drawings. <br /> b. Revisions to details shown on the Drawings. <br /> c. Changes made by Change Order. <br /> d. Details not on original Contract Drawings. <br /> 2. Mark completely and accurately record prints of Contract Drawings or <br /> Shop Drawings, whichever is most capable of showing actual physical <br /> conditions. Where Shop Drawings are marked, show cross-reference on <br /> Contract Drawings location. <br /> 3. Mark record sets with red erasable colored pencil; use other colors to <br /> distinguish between changes for different categories of the Work at the <br /> same location. <br /> 4. Mark important additional information which was either shown <br /> schematically or omitted from original Drawings. <br /> 5. Note construction change directive numbers, alternate numbers, Change <br /> Order numbers and similar identification. <br /> 6. Responsibility for Markup: Where feasible, the individual or entity who <br /> obtained record data, whether the individual or entity is the installer, <br /> subcontractor, or similar entity, is required to prepare the mark-up on <br /> record Drawings. <br /> a. . Accurately, record. information., in an.. understandable.. Drawing <br /> technique. <br /> b. Record data as soon asP ossible after it has been obtained. In the case <br /> of concealed installations, record and check the mark-up prior to <br /> concealment. <br /> c. At time of Substantial Completion, submit record Drawings to <br /> Architect for Owner's records. Organize into sets, bind and label sets <br /> for Owner's continued use. <br /> EXISTING ORONO MIDDLE SCHOOL-NEW MEDIA CENTER SECTION 01720-2 <br /> BID PACKAGE 1: GENERAL CONSTRUCTION,MECHANICAL&ELECTRICAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.