Laserfiche WebLink
B. Coordinate exact locations to access mechanical/electrical equipment. , <br /> C. Attach double layer of gypsum board to recessed ceiling panels in gypsum board ceilings and a single layer of , <br /> gypsum board and a layer of acoustical tile in areas with acoustical tile glued to gypsum board. <br /> 3.03 ADJUST AND CLEAN <br /> A. Adjust latching mechanism to operate smoothly. <br /> B. Leave work area clean and free of debris. <br /> END OF SECTION 08305 <br /> 08305-2 No.99132-CP2 ' <br />