Laserfiche WebLink
G. All faced edge seams to be continuously wire welded,finished smooth. <br /> 2.06 HARDWARE LOCATION <br /> A. Prepare for hardware at mounting heights and locations as recommended by the Builder's Hardware Manufacturing <br /> Association. <br /> 2.07 SHOP PAINTING <br /> A. Completely clean all frames by degreasing process,followed by one coat rust inhibitive primer equal to a salt spray <br /> test(5% solution) of 70 hours. Thoroughly prime all surfaces without runs, smears, or bare spots, and under and <br /> inside all removable stops. <br /> B. Completely clean all doors of impurities and pressure sand to a smooth surface and correct all irregularities with <br /> metallic putty sanded smooth. Provide one(1)spray coat of primer,baked on. Thoroughly paint unexposed inside <br /> surfaces of exterior doors,fire doors,and other doors occurring in excessive moisture area. <br /> C. Provide vinyl wash pre-treatment of galvanized steel as recommended by shop primer manufacturer. <br /> D. Provide one(1)quart minimum of primer for field touch up of splices,connections,welds and abrasions. <br /> 2.08 MODIFICATIONS TO EXISTING HOLLOW METAL , <br /> A. Where modifications to existing doors or frames are required to accept new doors or hardware, neatly make <br /> modifications in field per hardware templates. Provide flush metal blank off plates, welded in place, ground <br /> smooth,filled with body putty,where existing hardware is removed. Or,provide new door or frame conforming to <br /> project requirements. <br /> PART 3: EXECUTION , <br /> 3.01 INSTALLATION <br /> A. Securely fasten Work in place,without twists, warps,bulges or other unsatisfactory defacing of workmanship. Set <br /> plumb,level square to proper elevation true to line and eye. Set clips and other anchors with piston driven fasteners <br /> equal to Ramset or drilled-in anchors as approved. Fasten units and trim together with neat, uniform and tight <br /> joints. <br /> B. As masonry is being laid fill jambs solid with mortar and provide accurately cut wood spreaders temporarily at mid- <br /> section of fiames,install jamb anchors. <br /> C. At steel columns and/or concrete surfaces,install sub-frame or rough bucks as specified. At steel columns use 5/16" <br /> diameter self-tapping metal screws and at concrete use expansion bolts of the same diameter. Install frame to sub- <br /> frame and/or rough buck with countersunk self-tapping metal screws. Fill screw holes with a suitable metallic filler, <br /> sand,and prime. <br /> D. Where field installed hardware is required,provide wood or other suitable filler to avoid drilling and tapping into <br /> mortar inside frames. <br /> E. For all attachments including removable stops, use flat head self-tapping screws. Drill and tap in the field for <br /> surface mounted closers, brackets, rim exit devices, door holders, and other surface hardware. At horizontal <br /> exterior surfaces, set screws with neoprene gaskets or set with caulking compound under screw head and wipe <br /> clean. <br /> F. All field splices to be welded and filled with body putty and ground smooth, no exposed screw heads will be <br /> accepted. Locate splices where shown on final reviewed shop drawings. <br /> 081004 No.99132-CP2 ' <br />