My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Hot Weather: <br /> 1. Apply recommendations of ACI 305. <br /> 2. Employ suitable means to prevent too rapid drying. Shade fresh concrete as soon as possible without marring <br /> surface. <br /> ' C. Wet Weather: Unless adequate protection is provided,do not place concrete in rain,sleet or snow. <br /> 3.02 INSTALLATION OF EMBEDDED ITEMS <br /> A. Coordinate the installation of all required inserts prior placing reinforcing steel. <br /> B. Coordination with other Trades: <br /> 1. Include installation of anchors,sleeves,tiles,angles,etc.,furnished by contractors responsible for the facilities <br /> to be attached to these devices. Leave openings for pipes, ducts, etc., required for the ventilation, heating, <br /> electrical and plumbing work. Provide concrete pads for outside pipes and utilities as required. Notify all <br /> trades concerned with sleeves,inserts,etc.,to check their work before concrete is placed. <br /> 2. Embed no pipes other than electrical conduit and snow melting pipes in any structural concrete. Provide <br /> sleeves or holes for pipes passing through footings,foundations,beams and slabs. Refer to ACI 318-83. <br /> 3.03 INSPECTION <br /> A. Assure than excavation and form work are complete.Remove snow,ice and excess water. <br /> B. Check that reinforcement is secured in place. <br /> C. Verify that expansion joint material,anchors,and other embedded items are secured in position. <br /> 3.04 PREPARATION <br /> A. Lay vapor barrier below sand cushion for all interior slabs on grade. <br /> B. Lap joints minimum 6 inches and seal with sheathing tape. <br /> 3.05 INSTALLATION <br /> A. Placing Concrete: (ACI 304"Guide for Measuring,Mixing,Transporting and Placing Concrete"). <br /> 1. Convey concrete from mixer to final position by method which will prevent separation or loss of material. <br /> 1 2. Maximum height of concrete free fall 48". <br /> 3. Regulate rate of placement so concrete remains plastic and flows into position. <br /> 4. Deposit concrete in continuous operation until panel or section is completed. <br /> 5. Place concrete in horizontal layers 18 in.maximum thickness. <br /> 6. Do not vibrate forms or reinforcement. <br /> 03300-7 No.99132-CP2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.