Laserfiche WebLink
COMcheck Software version 4.0.6.2 <br /> Envelope Compliance Certificate <br /> Project Information <br /> Energy Code: 90.1 (2010)Standard <br /> Project Title: Orono Parking/Maintenance Garage <br /> Location: Orono, Minnesota <br /> Climate Zone: 6a <br /> Project Type: New Construction <br /> Vertical Glazing/Wall Area: 2% <br /> Construction Site: Owner/Agent: Designer/Contractor: <br /> 685 Old Crystal Bay Road North Ebert Construction <br /> Orono, MN 55356 23350 County Road 10 <br /> Corcoran, MN 55357 <br /> 763-498-7844 <br /> Building Area Floor Area <br /> 1-Parking Garage:Nonresidential 6784 <br /> Envelope Assemblies <br /> Assembly Gross Area Cavity Cont. Proposed Budget U- <br /> or R-Value R-Value U-Factor Factor.) <br /> Perimeter <br /> Roof 1:Attic Roof with Wood Joists,[Bldg.Use 1 -Parking Garage] 6784 40.0 0.0 0.026 0.027 <br /> Exterior Wall 1:Wood-Framed,24"o.c.,[Bldg.Use 1 -Parking Garage] 4208 19.0 0.0 0.065 0.051 <br /> Window 1:Vinyl/Fiberglass Frame,Perf.Type:Energy code default, 70 --- — 1.250 0.350 <br /> Single Pane,Clear,SHGC 0.82,[Bldg.Use 1 -Parking Garage] <br /> Door 1:Insulated Metal,Swinging,[Bldg.Use 1 -Parking Garage] 42 — — 0.250 0.700 <br /> Door 2:Insulated Metal,Non-Swinging,[Bldg.Use 1 -Parking Garage] 1120 — — 0.120 0.500 <br /> Floor 1:Slab-On-Grade:Unheated,Horizontal with vertical 2 ft.,[Bldg. 340 — 10.0 0.700 0.540 <br /> Use 1 -Parking Garage](b) <br /> (a)Budget U-factors are used for software baseline calculations ONLY,and are not code requirements. <br /> (b)Slab-On-Grade proposed and budget Ll-factors shown in table are F-factors. <br /> 'Envel•• • • better than code <br /> Envelope Compliance Statement <br /> Compliance 5tatement: The proposed envelope design represented in this document is consistent with the building plans, <br /> specifications, and other calculations submitted with this permit application.The proposed envelope systems have been <br /> designed to meet the 90.1 (2010)Standard requirements in COMcheck Version 4.0.6.2 and to comply with any applicable <br /> mandatory requirements listed in the Inspection Checklist. <br /> Project Title: Orono Parking/Maintenance Garage Report date: 08/23/17 <br /> Data filename: Untitled.cck Page 1 of 10 <br />