My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-00103 - garage detached
Orono
>
Property Files
>
Street Address
>
B
>
Big Island
>
540 Big Island - PID: 22-117-23-42-0001
>
Permits/Inspections
>
2018-00103 - garage detached
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:12:15 PM
Creation date
2/15/2018 2:26:35 PM
Metadata
Fields
Template:
x Address Old
House Number
540
Street Name
Big Island
Address
540 Big Island
Document Type
Permits/Inspections
PIN
2211723420001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Subject: Re: 540 Big Island <br /> All, <br /> Here is the last official survey that I have hand-marked to show generally where I would plan <br /> to put the retaining wall, paver patio, and steps (three sets). I understand that I will need to get <br /> all of this properly incorporated into the survey, with heights, etc., but wanted to forward along <br /> the concept to you now so that you can let me know if this generally looks ok. I understand <br /> you can't give approval or an opinion until all paperwork is submitted, but I would appreciate it <br /> if you could give me a heads-up if you see anything that would obviously be a problem in what <br /> I have attached. The retaining wall will be from approximately 6-8ft high at the corner of the <br /> garage and taper down to one or two feet at the front of the main structure/cabin. <br /> I will reach out to Mark @ Gronberg & Associates to update the drawing as needed. <br /> Thanks, <br /> Shawn <br /> On Tue, Jan 2, 2018 at 9:52 AM, Shawn Wischmeier<swischmeier@gmail.com>wrote: <br /> Roger, <br /> OK, thanks for the clear information. Will get to work on all of this ASAP. Will also wait on <br /> guidance regarding the retaining wall and patio. Makes good sense to get this all done <br /> correctly all at once so I will endeavor to include everything. Will get updated drawings all <br /> around. <br /> Shawn <br /> On Tue, Jan 2, 2018 at 9:23 AM, Roger Peitso <rpeitso( ci.orono.mn.us> wrote: <br /> Shawn, <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.