Laserfiche WebLink
PLAN REVIEW CHECKLIST FOR NEW STRUCTURES / ADDITIONS 2 <br /> Address: Permit No.:-2-01t--00 5 <br /> Description of work: Date Recd: 7 t 1 •it <br /> Septic review by: SMI{/r �" W Date Approved: <br /> Zoning review by:_ _ C--�, s',1�1 Date Approved: q' <br /> Building review by: 'f:�2 J Date Approved: Z <br /> :2a -7 <br /> Grading review by: ry, Vv Date Approved:_ • ��• <br /> Zoning District: P�t, ( ?D Zoning File#: to ' �Reso#: Reso Date: -7- 1140 <br /> Zoning: Lot Area: 7 4q L SF/AC Width: Lot Coverago SF ��•� <br /> Survey Submitted: I Yes 0 No Date of Survey: lY•q'�� Revised date(?): <br /> Landscape plan submitted? 0 Yes 0 No Landscaper: <br /> Proposed Setbacks: N in irievi&W <br /> Front( Rear(Str t) ( N S E W ) ( N S E W ) Other Buildings Wetland <br /> Side Side <br /> Defined Height: Peak Height: FFE: FFE minus 6 feet= _(Existing Contour; <br /> Perimeter(linear feet) = 50% _ _ grade <br /> Basement? 0 Yes 0 No, Stories <br /> FOR A BUILDING WITH A BASEMENT OR CRAWL SPACE: FOR A BUI <br /> The distance between the lowest proposed eg rade— <br /> START WITH floor(of the basement or crawl space)and ! ( chest existing <br /> the highest point of the roof. 1\J JVVV"`���""��` ,.,est point of the <br /> —.o if fill was ought in to <br /> If you have a... Xriome. <br /> SUBTRACTION GABLE OR HIPPED ROOF(no e—measure <br /> (BASED ON windows): Subtract half the distance ing grade to the <br /> ROOF TYPE) between the highest oint of the roof e roof. <br /> to the low of the corresponding If you have a... <br /> gabl hipped roof SUBTRACTI GABLE OR HIPPED ROOF <br /> ABLE OR HIPPED ROOF(with (BASED O (no windows): Subtract half <br /> windows): Subtract half the distance ROOF E) the distance between the <br /> between the top of the highest highest point of the roof to <br /> window and the highest point of the the low point of the <br /> roof corresponding gable or <br /> hipped roof <br /> • ALL OTHER ROOF TYPES(flat, GABLE OR HIPPED ROOF <br /> mansard,etc):No subtraction. (with windows): Subtract <br /> SUBTRACTION Subtract the distance between the half the distance between <br /> (BASED ON basement/crawl space floor and the the top of the highest <br /> EXISTING highest existing grade adjacent to the window and the highest <br /> GRADES) foundation OR 10 feet(whichever is less). point of the roof <br /> • ALL OTHER ROOF TYPES <br /> (flat,mansard,etc):No <br /> EQUALS Defined building height subtraction. <br /> Defined building height <br /> EQUALS <br /> Updated: May 2016 <br /> z:\forms\plan review checklist 5-2016.docx <br />