My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-00075 - addn/remodel/repair
Orono
>
Property Files
>
Street Address
>
C
>
Crystal Bay Road
>
3325 Crystal Bay Road - 17-117-23-41-0018
>
Permits/Inspections
>
2018-00075 - addn/remodel/repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:39:52 PM
Creation date
2/15/2018 12:13:54 PM
Metadata
Fields
Template:
x Address Old
House Number
3325
Street Name
Crystal Bay
Street Type
Road
Address
3325 Crystal Bay Road
Document Type
Permits/Inspections
PIN
1711723410018
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fees to be Charged YES NO <br /> Permit ` . ff <br /> Plan Review • <br /> State Surcharge °rt <br /> Investigation Fee <br /> t <br /> ° ' y '"ftl 9 4 ?a' t 3 <br /> Other(specify) IV� <br /> Square Footage $ per Square Footage <br /> Basement X = $ <br /> 15' Floor X = $ <br /> 2nd Floor X = ' $ <br /> Garage X = $ <br /> Estimated Construction Value: $ /gOJ o10 <br /> Orono Inspections Required Work Requiring Separate Permits <br /> .Footing ❑ Site (Plumbing 0 Grading/Filling <br /> O Poured Wall 0 Silt Fence/Erosion Control 21EL Mechanical 0 Fire <br /> O Foundation Survey 0 Hardcover Removal 0 Fireplace 0 Water Connection <br /> ❑ Framing 0 Other(specify) 0 Masonry 0 Sewer Connection <br /> ❑ Waterproofing/Drain tile 0 Mfg. 0 Lawn Irrigation <br /> O Foundation Waterproofing 0 Other(specify) 0 Landscaping <br /> Framing 0 Septic <br /> • Insulation <br /> Built Survey <br /> �- Final <br /> Lathe Required State Permits <br /> ❑ Other(specify) <br /> 0 Well XElectrical <br /> REMARKS (in-house): <br /> OFFICIAL REMARKS -TO BE NOTED ON PERMIT AND INITIALLED: <br /> (/ e Builder Acknowledgement Form <br /> ❑ Prior to release of escrow money an as-built survey and hardcover calculations must be submitted and approved. <br /> Updated: June 2017 <br /> z:\forms\plan review checklist 06-2017.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.