My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#6345-Prelim Plat-2013
Orono
>
Property Files
>
Street Address
>
N
>
Northern Avenue
>
3750 Northern Avenue - 17-117-23-34-0087
>
Resolutions
>
#6345-Prelim Plat-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:38:56 PM
Creation date
2/14/2018 1:07:13 PM
Metadata
Fields
Template:
x Address Old
House Number
3750
Street Name
Northern
Street Type
Avenue
Address
3750 Northern Avenue
Document Type
Resolutions
PIN
1711723340087
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY of ORONO <br /> RESOLUTION OFJJ 511�COUNCILNO. J <br /> �kESH D <br /> must be between a minimum of$3,250 and a maximum of$5,550 per residential <br /> dwelling unit. For the proposed 6 lots, the Park Fee will be based on 5 new lots. <br /> The City Assessor will be consulted to determine the final market value of <br /> the land for establishing the amount of the fee. <br /> b) Stormwater and Drainage Trunk Fee. The development is subject to the <br /> Stormwater and Drainage Trunk Fee of $5,765 per acre x 4.89 total acres = <br /> $28,191.00. <br /> 7. Utilities. The property is within the MUSA. Sewer and water service is available to the <br /> property in Northern Avenue. The property was provided with municipal water in 1970 <br /> and was assessed for its entire front footage but for only 3 water units. The subdivision <br /> consists of 6 total lots. The proposed subdivision will have a water connection charge <br /> due based on 3 additional units at$2,820.00 per unit=$8,460.00. <br /> The property was provided with municipal sewer in 1982 and initially assessed for 2.0 <br /> acres and 4 units. The developable acreage for this property would be calculated at 3.74 <br /> acres net of wetland and road, leaving 1.74 acres not assessed. Per the 2013 Orono Fee <br /> Schedule a sewer acreage charge is due based on $3,990 per acre x 1.74 acres = <br /> $6,943.00. Per the 2013 Orono Fee Schedule a sewer trunk unit charge is also due based <br /> on 2 additional units at$600 per unit, totaling$1200.00. <br /> 8. Existing Buildings. The developer shall remove the existing buildings as a condition of <br /> final plat approval. Removal shall occur prior to filing of the plat with Hennepin County. <br /> 9. City Engineer Approval. Approval is subject to the recommendations of the City <br /> Engineer in his comment letters dated September 9, 2013 and October 17, 2013 and any <br /> forthcoming comments as may be warranted. <br /> 10. Plans and Specifications. The following plans and specifications shall be submitted for <br /> review and approval by the City and other appropriate jurisdictions, to ensure that the <br /> proposed plat will accomplish the intended purposes: <br /> a) Final plans and specifications for all proposed utility lines and services, including <br /> proposed revisions, if any,to existing service facilities. <br /> b) Final grading, drainage and erosion control plan showing existing and proposed <br /> contours, building locations, elevations, stormwater facilities and calculations, <br /> utilities and erosion control measures to be used during construction. Final Plat <br /> Page 10 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.