My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-00159 - land alteration
Orono
>
Property Files
>
Street Address
>
F
>
Ferndale Road West
>
905 Ferndale Road West - 02-117-23-44-0032 - New PID
>
Permits/Inspections
>
2018-00159 - land alteration
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:11:19 PM
Creation date
2/14/2018 12:12:31 PM
Metadata
Fields
Template:
x Address Old
House Number
905
Street Name
Ferndale
Street Type
Road
Street Direction
West
Address
905 Ferndale Rd W
Document Type
Permits/Inspections
PIN
0211723440032
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> ., • r44 <br /> �� fir <br /> � f <br /> • <br /> Black Bear Builders <br /> Office: (952)249-0972 • Cell: (612)282-7949 <br /> Email: Stuart@BlackBearBuildersMn.com <br /> 13333 179th Circle NW • Elk River, Minnesota 55330 • License# BC639692 <br /> 2/13/18 <br /> RE: <br /> John and Joan Brooks <br /> 905 Ferndale Road West <br /> Orono, MN 55391 <br /> Scope: Dredging a channel from lagoon to main lake. <br /> Goals: To create a channel for the Brooks to gain access to their lagoon and be able to <br /> use their dock. <br /> Description: <br /> We plan to do our dredging from the ice with a small backhoe, bobcats, dump trucks and <br /> containers. The backhoe will remove the dredging and place the material into small <br /> containers to be transported across the ice onto the Brooks property. The containers will <br /> be emptied into the staging area to have a chance to dry and freeze. The following days <br /> will involve removing the previous days dredging from the Brooks property into dump <br /> trucks and then it will be transported to the landfill (Dem-Con) in Jordan MN while <br /> continuing the dredging on the lake. At the end of the project,we will spread black dirt <br /> and grass seed over the staging area and return the Brooks property back to its original <br /> state. <br /> Schedule: <br /> February 13-March 6 <br /> Hauling: M-F during Dem-Con working hours of operation. <br /> Route: Ferndale Road West,to Hwy 15 East,to Hwy 12 E,to 169 South to Jordan. <br /> Sincerely, <br /> Stuart Cleaveland <br />
The URL can be used to link to this page
Your browser does not support the video tag.