Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
SPEC'S Pg 3 of 4 <br /> DRYWALL- '/2"gypsum board over wall studs w/taping process, sanded smooth for <br /> owner's finish. <br /> - 5/8"gypsum board for all ceiling or soffit applications w/taping process and <br /> "medium"texture finish. <br /> - 5/8"type"X"gypsum board for garage ceiling, "fire tape"installation. <br /> PLUMBING—extend roof vent through new regal roof framing. <br /> ELECTRIC per contract: <br /> * ALL FIXTURES, if on job site at electrical finish, are furnished by owner <br /> (UL listed), installed by SAWHORSE <br /> * Switch and outlets to be"IVORY" color. <br /> * SECURITY rough-ins are by owner. <br /> * SAWHORSE will advise owner when to call for installation. <br /> * No DOOR BELL BUTTON relocation is included in this contract <br /> * Work excludes upgrading existing electrical service. <br /> "Note you have been charged in this contract for the following: <br /> 2 -removals/relocations in existing area. <br /> 1 - Telephone jack <br /> I -TV/cable jack <br /> 2 -circuits added as needed for addition/remodeling. <br /> 1 -hardwired and 3 battery powered smoke detectors <br /> 5 -interrupter"GFP'receptacle. <br /> 6 -standard switches <br /> 4 three or four way switches <br /> 4 -standard interior light openings(no fixtures included). <br /> 2 -ceiling fan/light openings <br /> 6 -assembled fixtures supplied by OWNER, installed by SAWHORSE. <br /> -add one Broan 70cfin bath fan to existing bath room. <br /> Any changes to the above quantities will be charged or credited accordingly. <br /> * Indicates any special receptacles needed for computers, entertainment centers, etc. and <br /> any special heights wanted. <br /> GENERAL NOTES <br /> CAUTION: <br /> Do NOT remove,tear down,or dig up anything before building permit is on job <br /> site. <br /> OWNER to protect or move all personal property from in or around construction <br /> area, both interior and exterior. Please review area before construction start-up <br /> and remove necessary items. <br /> Clean up of building debris at job completion by SAWHORSE. <br /> Dumpster may be left on job site for building debris. <br /> (No tires, appliances or neighbor's mattress). <br /> Any yard damage REPAIR including trees, shrubs and all landscaping by OWNER <br />