Laserfiche WebLink
BOAT CITY OF ORONO <br /> e' <br /> RESOLUTION OF THE CITY COUNCIL <br /> NO. 683 1 <br /> � G 4'ESHO <br /> for a 3-lot plat per the Preliminary Plat survey/drawing David Knaeble dated 12/12/17 and <br /> Bennetts Woods Plans dated 12/12/17 and attached hereto as Exhibits A through H, subject to <br /> the following conditions: <br /> 1. Council approval is based on the entire record, above Findings. <br /> 2. The Developer shall implement and adhere to the provisions of the Conservation Plan by <br /> Jacobson Environmental dated December 12, 2017. <br /> 3. The Developer shall provide a maintenance agreement meeting the Minnehaha Creek <br /> Watershed District's requirements to outline responsibility for all future maintenance <br /> activities related to the stormwater facilities and the Conservation Plan. <br /> 4. Existing grade for all lots for building height determination shall be the proposed grades <br /> as shown on the Preliminary Grading Plan dated 12/12/17 attached as Exhibit B. The <br /> grading plan as approved establishes new existing grades for building pads. <br /> 5. Development Fees <br /> a. Park Dedication - The Parks, Open Space and Trail Plan element of the Orono <br /> Comprehensive Plan does not specify the need for a neighborhood park at this <br /> location. A Park Dedication Fee in lieu of land would be appropriate per City <br /> Ordinance. The Park Fee is determined as 8% of the fair market value of the land <br /> being subdivided, but must be between a minimum of $3,250 and a maximum of <br /> $5,550 per residential dwelling unit. For the proposed lots, the Park Fee would be <br /> based on only the 2 new lots. The City's Assessor will be consulted to determine <br /> the market value of the land for establishing the amount of the fee. Park Fee Due <br /> $11,100. <br /> b. Stormwater and Drainage Trunk Fee. The development is subject to the 2018 <br /> Stormwater and Drainage Trunk Fee of $6,050 per acre. For the 1/2-acre zoning <br /> districts, any lot exceeding 0.5 gross acres, including wetland, shall be charged a <br /> maximum trunk fee equal to the trunk fee for a 0.5 acre parcel. Therefore $6,050 <br /> x 1.5 [3 lots x 0.5 = 1.5 total acres] = $9,075.00. <br /> 6. Utilities. The property is within the MUSA. Sewer and water service is available to the <br /> Property. According to the as-built record sewer plan, the Property has one stub on Togo <br /> Road and two stubs at Northern Avenue. The property was fully assessed for 294 feet of <br /> front footage, which includes both Togo and Northern frontages. <br /> 5 <br />