Laserfiche WebLink
Christine Mattson <br /> From: Christine Mattson <br /> Sent: Monday, June 23, 2014 9:38 AM <br /> To: 'Brad Maenner' <br /> Cc: Melanie Curtis; Lyle Oman <br /> Subject: 3590 Northern Avenue As-Built/#2013-00431 <br /> Brad, <br /> We received an as-built survey dated 5-20-2014 and the property was inspected. Please see the engineers comments, <br /> make necessary corrections and call for another inspection. <br /> Please don't hesitate to contact us if you have any questions. <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelley Parkway Orono MN 55356(physical address) <br /> PO Box 66 Crystal Bay I MN 55323-0066 (mailing address) <br /> 9 952.249.4620 o g 952.249.4616 <br /> ® cmattson@ci.orono.mn.us j www.ci.orono.mn.us <br /> Summer Office Hours: (Monday, May 19 through Friday,August 29,2014) <br /> Monday-Thursday: 7:30 am to 5 pm <br /> Friday: 7:30 am to 11:30 am <br /> OUR OFFICE WILL BE CLOSED: Friday,July 4, 2014 <br /> From: David Martini [mailto:davidma@bolton-menk.com] <br /> Sent: Wednesday, June 18, 2014 4:22 PM <br /> To: Christine Mattson <br /> Cc: Melanie Curtis <br /> Subject: 3590 Northern Avenue <br /> Christine, <br /> As requested, I have reviewed the as-built survey for 3590 Northern Avenue. Based on my review, it appears that there <br /> are several restoration items that need to be addressed before the City accepts this project as complete. My comments <br /> are as follows: <br /> 1. It appears that the lot has been graded in substantial compliance with approved grading plan. <br /> 2. The original plan show one rock retaining wall to be constructed along the west side of the house. The as-built <br /> condition has two retaining walls constructed out of lumber that appear to be failing. I don't think having two <br /> walls is an issue but the walls need to be reconstructed so that they retain the soils behind them as originally <br /> intended. A different design and materials may be needed to ensure that the walls function as intended. <br /> 3. There is a lot of erosion on site that needs to be corrected. It appears that minor grading is needed in areas <br /> along the house and turf needs to be established. <br /> i <br />