Laserfiche WebLink
CITY OF ORONO SEPTIC SYSTEM PERMIT APPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay,Mn 55323 <br /> JOB SITE <br /> ADDRESS �� `� — IVO{-T/7,—\_ <br /> Occupancy Type: Residential >( Commercial Other <br /> Permit Type: New o Replacement Syste $100.00 /COQ C7y <br /> Repair Existing System $ 50.00 <br /> (Tanks or Drainfield) <br /> $0.50 State surcharge added to above fees <br /> * See fee schedule for non-residential permit fees <br /> v C f -e 1,1K e Phone Number: 4S-dZ - q/;2 —`? qc <br /> Owner's Name: e <br /> Mailing Address: S y! &/01-21 s rL e�� iLF� City: `k"n Zip: <br /> Contractor's Name. _r x � Phone Number: 6�,�- 868-�' <br /> Mailing Address: 7/,9r Kc,)­z 4&- e <br /> City /4`P� Zip: 5 3G<:g <br /> *** DO NOT MAIL PAYMENT WITH THUS APPLICATION* � <br /> GENERAL INSTRUCTIONS p <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City V1 <br /> Offices; however, permits will not be mailed out. The permit must be picked up in person 08 <br /> at the City Offices and work must not begin unless the permit card is on the job site. <br /> 2. Permits will be issued only to contractors holding a Minnesota Pollution Control <br /> Agency(MPCA) Septic System Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Design reports <br /> are not considered approved unless accompanied by the "City of Orono Septic System <br /> Approval" cover sheet signed by the City Inspector. <br /> 4. The following inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to covering. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required after <br /> rough up but prior to sand placement (sand will be jar tested for silt content), and again <br /> during pressure distribution piping installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump stations <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holding N1PCAInstallers License shall be present during all inspections. A24-hour <br /> notice is required for all inspections. <br />