My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-009352 - detached garage
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive W
>
1130 North Shore Drive West - 07-117-23-23-0006
>
Permits/Inspections
>
1997-009352 - detached garage
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:32:29 PM
Creation date
2/9/2018 2:15:00 PM
Metadata
Fields
Template:
x Address Old
House Number
1130
Street Name
North Shore
Street Type
Drive
Street Direction
West
Address
1130 North Shore Dr W
Document Type
Permits/Inspections
PIN
0711723230006
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Walter Holzer <br /> August 22, 1997 <br /> Page Two <br /> 4. The slab is constructed on 20"of pit run clean gravel. <br /> 5. The excavation area is oversized 6 feet on all sides on the clay subgrade. The clay surface is <br /> pitched to the edges. <br /> 6. The concrete delivery ticket indicates the concrete was furnished by Cemstone Products <br /> Company with a specified strength of 4000 psi at 28 days with 6%air entrainment. <br /> ENGINEERING ANALYSIS <br /> 7. The foundation under construction meets the requirements for a group M occupancy structure <br /> using thickened slab construction. <br /> 8. The system is structurally adequate to support the design loads as required by the Code. <br /> 9. A thickened slab foundation system does not go down to frost, therefore movements as much as <br /> 3"to 4"can be expected at times during winter months for this type of construction. <br /> 10. The thick gravel bed will help minimize the amount of movement. Drainage of this gravel fill is <br /> very important. It is strongly recommended that a draintile system be installed daylighting away <br /> from the structure. This will ensure that the gravel fill is kept as dry as possible. <br /> 11. A minimum amount of steel is being installed in the thickened slab portion and in the slab. It is <br /> recommended that the slab be saw cut into relatively square units, in this case six units would be <br /> appropriate. Anticipated loads are light. <br /> GENERAL <br /> 12. This slab foundation system is consistent and meets the requirements for Group M thickened slab <br /> foundation systems in the Code. <br /> If you have any questions,please contact me. <br /> Sincerely, <br /> J. ME GINEERING,INC. <br /> John . DahlmeWer, . <br /> JHD <br /> I hereby certify that this plan, specification or report was <br /> prepared by me or under my direct supervision and that I am a <br /> duly registered professional engineer under the laws of the State <br /> of ota. <br /> Mi sota Registration No.9212 <br />
The URL can be used to link to this page
Your browser does not support the video tag.