Laserfiche WebLink
v <br /> CITY OF ORONO APPLICATION FOR MECHANICAL PERMIT <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, MN 55323 <br /> GENERAL INFORMATION <br /> 1. You may apply for mechanical permits by mail or in person at the City offices. . Applications will be <br /> reviewed and a permit will be issued within 2 working days. <br /> 2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT VALID UNTIL <br /> YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS POSTED ON <br /> THE JOB SITE. <br /> 3. Mechanical Designs - Complete calculations, details and specifications are required for each heating, <br /> ventilation, humidification-dehumidification, and air conditioning installation including heat loss/heat gain <br /> calculation, design temperatures, equipment ratings and identification as to type, manufacturer and model. <br /> Data shall be presented on form provided. Identification of and specifications for water heating equipment <br /> shall also be provided. <br /> 4. When any new construction or remodeling is involved, a separate building permit must be obtained. <br /> 5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code requirements. <br /> 6. All work must be inspected(rough-in and final). Call 249-4600. 24-hour notice required. <br /> 7. House Heating Test Record must be submitted before final. <br /> Instructions Complete all items on this application. Compute the permit fee. Sign and date the certification. <br /> INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED. If you have questions, call 249-4600. <br /> Please check one: New Addition Repair Replace <br /> Residential Commercial _ <br /> �� <br /> JOB SITE:�� ��n't��1 �� Zi : 3 �4nt�, ��� . e� � p <br /> Owner's Name: g06< � k ,0 cl Telephone Number: <br /> Mailing Address: I L 5 Dur r) City: Zip: 5�73 Lj, <br /> Contractor's Name: C. 0 CEJ Telephone Number:9S�07 3-`d 7�3 <br /> Mailing Address: f City: Zip: <br /> SYSTEM DESCRIPTION <br /> HEATING SYSTEMS <br /> Quantity: <br /> Make: &61 « yy\ <br /> Model: J6 <br /> Fuel: N } <br /> Flue Size: ") <br /> Input BTUs: El� 000 <br /> Output BTUs: Ll <br /> CFM: <br /> COOLING SYSTEMS <br /> Quantity: <br /> Make: <br /> Model: <br /> Tons: <br /> H. Power <br />