My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic info including 2003 design
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive W
>
1030 North Shore Drive West - 07-117-23-23-0038
>
Septic
>
septic info including 2003 design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:32:45 PM
Creation date
2/9/2018 1:09:44 PM
Metadata
Fields
Template:
x Address Old
House Number
1030
Street Name
North Shore
Street Type
Drive
Street Direction
West
Address
1030 North Shore Dr W
Document Type
Septic
PIN
0711723230038
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE EVALUATION REPORT <br /> for Bob Morlock <br /> Sewage Treatment System Page- 4 <br /> Construction vehicles shall not be allowed on the filter material until backfill is placed. <br /> Sandy loam soil shall be placed on the filter material to a depth of 12 inches in the center of the mound <br /> and to a depth of 6 inches at the sides. <br /> Six inches of topsoil shall be placed on the fill material over the entire area of the mound. A grass cover <br /> shall be established over the entire area of the mound. No shrubs shall be planted on the top of the <br /> mound. Shrubs may be placed at the foot and side slopes of the mound. <br /> The side slopes of the mound will be 4 feet horizontal to 1 foot vertical(4:1). This gentle slope will <br /> allow easy mowing of the grass cover. The soil material.at the toe of the dike should be slightly less <br /> permeable or somewhat tighter than the natural soil below the mound. This can be accomplished by <br /> selecting a finer soil or by compaction. <br /> Whenever mounds are located on slopes, a diversion shall be constructed immediately up slope from the <br /> mound to intercept and divert runoff. <br /> PUMP AND COLLECTION TANK: <br /> A pump shall be used to deliver eluent to the mound. The pump shall be cast iron or bronze fitted with <br /> stainless steel screws or constructed of other sound, durable and corrosion resistant materials. <br /> The pump installed will need to deliver 66.6 gallons per minute with a head of at least 25 feet. An alarm <br /> device shall be installed to warn of pump failure. Install the pump control and a Meyers,Model D.L.V. <br /> Audio Visual,Lo-Voltage alarm system or approved equal in a conspicuous place at the direction of the <br /> owner. Dosing Vohune=25%of 750 g.p.d. = 187.5 gallons. <br /> DRAINFIELD ROCK REQUIRED: <br /> Based on 12 inches of rock,27.8 cubic yards of rock would be required. <br /> SAND REQUIRED: <br /> Approximately 420 cubic yards of clean sand for under mound is needed. <br /> NOTES: <br /> A. Please see site plan layout. <br /> B. Typical sections for construction follow: <br /> C-7 E-3 E4 E-6 E-12 F-7 <br /> PROPOSED ELEVATIONS: <br /> Lowest Floor = 1024.00 <br /> Top of 1" Septic Tank = 1029.50 <br /> Top of 2°d Septic Tank = 1029.20 <br /> Top of Pump Tank = 1028.90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.