My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-20-2017 Planning Commission Packet
Orono
>
Planning Commission
>
2017
>
11-20-2017 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2018 8:40:00 AM
Creation date
2/9/2018 8:39:03 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IVY PLACE - PROPOSED CONDITIONS <br /> 17059 - IVY PLACE - PROPOSED Type II 24-hr 10-YEAR Rainfall=4.24" <br /> Prepared by Microsoft Printed 7/17/2017 <br /> HydroCAD® 10.00-19 s/n 02202 ©2016 HydroCAD Software Solutions LLC Page 23 <br /> Summary for Reach 4R: TOTAL <br /> [40] Hint: Not Described (Outflow=Inflow) <br /> Inflow Area = 2.160 ac, 19.25% Impervious, Inflow Depth > 2.37" for 10-YEAR event <br /> Inflow = 7.24 cfs @ 12.06 hrs, Volume= 0.426 af <br /> Outflow = 7.24 cfs @ 12.06 hrs, Volume= 0.426 af, Atten= 0%, Lag= 0.0 min <br /> Routing by Stor-Ind+Trans method, Time Span= 0.00-20.00 hrs, dt= 0.01 hrs <br /> Reach 4R: TOTAL <br /> Hydrograph <br /> 8 / 17 94 rf G Inflow <br /> C'Outflow <br /> Inflow Area=2.160 ac cfs <br /> 7 <br /> 6 0 <br /> 5 <br /> e A <br /> 4- <br /> o <br /> LL <br /> 3 <br /> 0 <br /> 0 <br /> 0 1 2 3 4 5 , 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 <br /> Time (hours) <br />
The URL can be used to link to this page
Your browser does not support the video tag.