My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-20-2017 Planning Commission Packet
Orono
>
Planning Commission
>
2017
>
11-20-2017 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2018 8:40:00 AM
Creation date
2/9/2018 8:39:03 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> 9. Additional approvals <br /> a. Variance from the wetland setback <br /> b. Variance of wetland buffer impact(Watershed District) <br /> c. Conditional Use Permit for filling in the floodplain <br /> d. Successful vacation of the existing Driveway easement (Doc.1023891) <br /> e. Successful realignment of a underground utility easement (Document Nos. 855727 and <br /> 862192) <br /> CSG RESPONSE: NOTED,APPLICATIONS ARE TO BE REVIEWED, EASEMENT DOCUMENTATION WILL <br /> RE FORTHCOMING ONCE APPROVED. <br /> 10. The applicant had represented they have legal access. To the extent that the access rights <br /> are modified through court order or other means,the plat would be voided. <br /> CSG RESPONSE: NOTED, SITE ACCESS IS EXPECTED TO REMAIN AS IS <br /> 11. The following estimated fees are due at the time of final plat unless otherwise noted <br /> Stormwater and Drainage Trunk: The property will be subject to the Stormwater and <br /> Drainage Trunk Fee (SW&DT Fee) on a per-lot basis at the rate of$3,025 per lot for this half- <br /> acre zoning district ($6,050 total) per the 2017 Fee Schedule. <br /> Water and Sewer: The property was fully assessed for municipal sewer in 1965, only the <br /> Metropolitan Council SAC charge which is currently $2,485 per dwelling unit. City water was <br /> installed in 1970 and the property was assessed for one unit; if more than one home is <br /> built, a water connection charge of $4,240 for the second unit would be due at the time a <br /> building permit is issued. <br /> CSG RESPONSE: NOTED, RESPONSIBILITY OF OWNER <br /> 12. Council approval is based on the entire record, above Findings. <br /> CSG RESPONSE: NOTED <br /> 13. Any amendments to the plans which are not in conformity with City codes may require <br /> further Planning Commission and City Council review. <br /> CSG hEsPONSE: NOTED, FU f URE COLVIPVMEN1 EXPECTED <br /> 14. Authorities granted by this resolution run with the Property not with the Applicants, but are <br /> permissive only and must be exercised by filing a final Plat application within one year of the <br /> date of Council approval, or the preliminary plat will expire on that date (September 11, <br /> 2018). <br /> CSG RESPONSE: NOTED <br /> 15. Violation of or non-compliance with any of the terms and conditions of this resolution may <br /> result in the termination of any authority granted herein. <br /> CSG RESPONSE: NOTE <br /> ' 9 <br /> l'' kLLCE:VEL) <br /> 8, <br /> -t-t3 <br /> bo- ) 0c017 <br /> 4931 West 35"'Street•Suite 200•St.Louis Park•Minnesota•55416•www.civilsitegroup.com <br /> Matt Pavek,PE 763-213-3944 Patrick Sarver,PLA•952-250-2003 <br /> CITY OF ORONO <br />
The URL can be used to link to this page
Your browser does not support the video tag.