My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-16-2017 Planning Commission Packet
Orono
>
Planning Commission
>
2017
>
10-16-2017 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2018 2:26:54 PM
Creation date
2/8/2018 2:25:49 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• MCWD-The MCWD Permitting Staff will be briefed on the Concept Plan in advance <br /> of defining the specific MCWD requirements for the Preliminary Plat on September <br /> 21, 2017 <br /> • LMCD-The LMCD Executive Director was briefed on the project, including the <br /> requirement for individual property owners to obtain their own dock permits, on <br /> September 12, 20-17; no issues were identified. <br /> • MN State Archeologist-Orono City Staff recommended that SHPO be contacted <br /> regarding any information available on possible burial mounds in the vicinity. SHPO <br /> suggested contacting the Minnesota State Archaeologist as they had no relevant <br /> information on the subject for this area. The State Archaeologist advises that a group <br /> of 20 burial mounds, called the Starvation Point Mound group, is located within 750' <br /> of the property, to the north of the property, and recommends coordinating the plans <br /> with the Minnesota Indian Affairs Council. Excavation along County 15 and south to <br /> the point has been rather extensive with County 15, Bracketts Point Road (public and <br /> private), a sanitary sewer line, a lift station, a joint trench for small utilities and <br /> multiple residence excavations with no burial mounds detected. Nevertheless, <br /> coordination with MIAC has begun and will continue throughout the life of the project; <br /> additional information will be provided to Staff as it becomes available. <br /> • N'Hood meetings-Concept Plan briefings for the neighbors will begin immediately <br /> after Concept Plan submission. <br /> 3977 SEP 2QZW11 <br /> CITY OF ORONO <br />
The URL can be used to link to this page
Your browser does not support the video tag.