My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-17-2017 Planning Commission Packet
Orono
>
Planning Commission
>
2017
>
07-17-2017 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2018 11:06:15 AM
Creation date
2/8/2018 11:05:34 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B. Sewer and Water Connection Charges. For any Phase for which Final Nat Approval is <br /> granted after December 31, 2003, the Sewer and Water Connection Charges due shall be <br /> recalculated based on the then current City Fee Schedule SWCC rates. The Developer <br /> shall be allowed to prepay SWCC fees for future Phases at the 2003 rate no later than <br /> December 31,2003. <br /> C. Storm Water & Drainage Trunk Fees. For any Phase for which Final. Plat Approval is <br /> granted after December 31,2003,the SW&DT due shall be recalculated based on the then <br /> current City Fee Schedule SW&DT rates. The Developer shall be allowed to prepay SW& <br /> DT fees for future Phases at the 2003 rate no later than December 31,2003. <br /> VI. Pending MnDOT Stormwater Pond Charge <br /> MnDOT has established a$35,000 charge to the City for construction of the existing stormwater <br /> pond within the MnDOT right-of-way. If the City is unsuccessful in eliminating this charge, the <br /> Developer has agreed to pay a portion of this charge,amount to be established,per the Developer's <br /> letter of October 2,2002 on file in the City Offices. <br /> Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.