My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-17-2017 Planning Commission Packet
Orono
>
Planning Commission
>
2017
>
07-17-2017 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2018 11:06:15 AM
Creation date
2/8/2018 11:05:34 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
e) Due to the Phasing of the project and the resultant lengthy period of time the site will be <br /> under construction,the Developer shall as a condition of the PUD No.4 Agreement provide <br /> an escrow(amount to be determined)to cover the inspection costs of ongoing erosion control <br /> inspections. <br /> f) The Developer shall obtain all necessary permits (including but not limited to NPDES, <br /> MCWD and MnDCT permits) from the appropriate agencies for erosion control prior to <br /> commencing excavation on the site. <br /> g) In the event that the Developer's NPDES permit requires a Best Management Practices Plan, <br /> such plan shall be submitted to the City prior to commencing excavation on the site. <br /> h) The construction limits shall be clearly marked with adequate fencing to prevent any <br /> construction damage or disturbance of any trees and vegetation outside of the construction <br /> limits area. Prior to commencing excavation on the site,Developer shall identify trees to be <br /> preserved, shall mark them on a site plan, and shall take extraordinary measures such as <br /> fencing,signage,etc. to ensure they are not disturbed. <br /> S. Other General Conditions <br /> a) Monument signs as depicted in Sheets L7.1 and others maybe provided by the developer at <br /> each entrance to the RPUD development site. The signage shall be limited to a development <br /> name and/or logo and street address on the monument signs. Any changes to the final <br /> design/materials of monument signage from those shown on the approved plans shall be <br /> subject to approval by the City Council. <br /> b) Any design,material or specification revisions from the approved plans involving streets, <br /> utilities,stogy sewer facilities,grading or the regional pond shall be subject to approval by <br /> the City Engineer prior to implementation of such changes. <br /> c) Any design,material or specification revisions from the approved plans involving dwelling <br /> unit design guidelines, architectural styles,building location, site landscaping, and other <br /> approved/required site amenities,shall be subject to approval by the Planning Director and <br /> may be subject to review and approval by the City Council at the discretion of the Planning <br /> Director. <br /> d) Prior to release of the final plat,City Attorney shall review and approve the covenants and <br /> documents describing the creation,structure,rights, obligations and responsibilities of the <br /> various homeowners associations serving the development. The covenants shall include <br /> conditions of this resolution that have not been met as of the release of the plat, provide <br /> common access easements for each lot that receives access from a shared private street or <br /> driveway,and shall provide for maintenance of all common areas. <br /> Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.