My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-17-2017 Planning Commission Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
2010-2019
>
2017
>
07-17-2017 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2018 11:06:15 AM
Creation date
2/8/2018 11:05:34 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17-3948 <br /> July 17,2017 <br /> Page 4of7 <br /> parking while avoiding water table issues. <br /> The building setbacks meet minimum RPUD standards, <br /> Preliminary Plat <br /> The property is currently Outlot D of Stonebay. The property must be platted to a buildable lot to allow for <br /> development. The proposed plat, Stonebay Eighth Addition, is consistent with the master plan of the <br /> development, and includes easements outlined in the original plat. The location of the storm water pipe <br /> along the southern property line and the watermain along the east end (discussed below) will need to be <br /> verified and if necessary,the easements adjusted. <br /> Development of the property is subject to the various fees established within Exhibit M of the PUD No. 4 <br /> Agreement, all of which were deferred until a development plan is approved for each of the commercial <br /> outlots (Outlots A& D). Below is a summary of the fees,collectible in full at the time of approval of the <br /> final plat. These fees will be recalculated at the time of Final Plat: <br /> Park Dedication Fee: <br /> $3,250/unit x #of units (example: 48 units x$3,250=$156,000) <br /> Sewer Connection Charge: <br /> $6,330/acre x 3.5 acres=$22,155.00 <br /> Water Connection Charge: <br /> $10,480/acre x 3.5 acres=$36,680.00 <br /> Stormwater& Drainage Trunk Fee: <br /> Residential>4 units/acre: $8,490/ac x 3.5 acres=$29,715.00 <br /> Note that per the Agreement, the Park Fee is not adjusted for inflation, while the connection charges and <br /> Stormwater&Drainage Trunk Fee are calculated based on the current(2017) Fee Schedule. <br /> Conditional Use Permit <br /> Access,Internal Circulation and Parking <br /> The plan provides one access,from Kelley Parkway. There are no accesses onto Wayzata Blvd. The access <br /> will line up with the exit of the Stonebay Lofts access. <br /> Internal circulation is proposed to be provided by a paved driveway around the building. This driveway <br /> will serve as the fire lane. The Fire Chief notes that the fire lane should be 20 feet minimum width. Portions <br /> of the proposed drive do not meet the setback requirements of 20 feet requiring a waiver. <br /> Parking as depicted includes 46 surface stalls and 39 underground stalls,for a total of 85 spaces. While the <br /> Orono Zoning Code does not specify a numerical parking requirement for the continuum of care, the ITE <br /> Parking Generation manual,4th addition suggests the need for 53-67 stalls,based on the following uses: <br /> Independent Living: 1.0- 1.15 stalls per unit(Low rise apartment building) <br /> Assisted Living: 0.5 stalls per unit,or 1 per 3 beds <br /> Memory Care: 1 stall per bed <br /> Parking appears to be sufficient. <br /> Parks,Trails,Sidewalks <br /> Development of the property is subject to the conditions of approval of the Stonebay PUD. No. 4 <br /> Agreement.In part the Agreement requires establishment and construction of a trail system in Outlot D.An <br /> excerpt from the Agreement,Exhibit K,"Special Conditions", Item 1 (Transportation)reads as follows: <br /> h) An 8' wide bituminous surfaced public pedestrian/bicycle trail shall be constructed by the <br /> Developer or his successors in ownership within Outlots A and D along Highway 12, connecting <br />
The URL can be used to link to this page
Your browser does not support the video tag.