My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-19-2017 Planning Commission Packet
Orono
>
Planning Commission
>
2017
>
06-19-2017 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2018 10:48:13 AM
Creation date
2/8/2018 10:44:02 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LEGAL DESCRIPTION: GRADING&EROSION CONTROL NOTES: PC <br /> The East 50 feet of the West 158 feel of the South 175 feet of Lot 4,Block IS, Exhibit C <br /> BEFORE DEMOLITION AND GRADING BEGIN • Streets and other public ways stall be inspceted daily and if or soils has been deposited i <br /> TOWNSITE OF LANGDON PARK,Hennepin County,Minnesota,except <br /> • Install silt r ncebio ml around the perimeter of the construction area. promptly be removed. #17-3942 <br /> street. <br /> • Sediment control measures must remain in place until final stabilization has mon established and then shall • If necessary,vehicles,that have mud on their wheels,shall be cleaned before exiting the site i <br /> SCOPE OF WORK&LIMITATIONS: be removed.Sediment controls may be removed to accommodate short lane construction activity but must entrance arms. <br /> I. Showing the length and direction of boundary lines of the legal be replaced before the next rain. <br /> description listed above. The scope of our services does not include • Moisture roan he applied w diatmbul uveas to control dant as needed. <br /> • A temporary rock construction entrance shall be established at each access point to the site and a 6 inch <br /> determining what you own,which is a legal matter. Please check the layer of I to 2 inch rock extending at least 50 feet from the street into the site and shall be underlain with • Portable toiler facilities shall he placed on site lin use by workers and shall be properly"minlamed. <br /> legal description with your records or consult with competent legal permeable geolextile fabric. the entrance shall be maintained during construction by top dressing or <br /> 4 counsel,if necessary,to make sure that it is correct and that any matters washing to prevent tracking or flow of sediments onto public streets,walks or alleys.Potential entrances • If it becomes neressery to pwnp the excavation during construction,pump discharge shall be into the <br /> k of record,such as easements,that you wish to be included on the survey that are not so protected shall be closed by fencing hi prevent unprotected exit from the site. stockpile areas so that the doable silt fence around these areas can filter the water before it leaves the site. <br /> have been shown. DURING CONSTRU('I ION <br /> i • Temporary erosion control shall be installal no later than 14 days after the site is first 22-111 <br /> 2-It and shall <br /> 0K5.7°1 <br /> -' !! 2. Showing the location of observed existing improvements we deem • when din stockpiles have been crated,a double row of silt fence shall be placed to present escape of consist of broadcast seeding with Minnesota Department of Transportation Seed Mixture'_'_-I I I at I W <br /> necessary for the survey, sediment laden ninon' ifthe piles or other disturbed areas are to remain inplacefor more than 14 days, lb/acre followed byspray nm <br /> 1 coveting with s m lit. <br /> 4 3. Setting survey markers or verifying existing survey markers to establish they shall be reeled with Minnesota Department of Transportation Seed Mixture 22-111 at 100 lb/acre <br /> ..ry ( the corners of the property. followed by covering with spray mulch. SITE WORK COMPLETION: <br /> 5 ! 4. Showing and tabulating impervious surface coverage of the lot for your • When final grad ng has been complete)but before was m of seed or sod an'as bulli'survey shall be <br /> F.,.0:-......i review and for the review of such governmental nearer that mayhave • A d'mrpsreg shall be placed on the site for prompt disposal of construction debris.These dwnpsters shall be done per Orono requirements to insure that grading was properly done. <br /> Q g agencies serviced regularly to prevent overflowing and blowing onto adjacent properties.Disposal of solid wastes <br /> XP$11 ` jurisdiction over these requirements to verify they are correctly shown from rhe site shall in accordance with Minnesota Pollution Control Agency rcyueeroents.• • When any remedial grading has been completed,soil or seeding shall be complenul including any erosion <br /> before proceeding with construction. control blankets ler steep areas. <br /> 5. Showing elevations on the site at selected locations to give some Asepararc container shall be placed for disposal of hazardous waste.Hazardous warms shall be disposed <br /> indication of the topography of the site. We have also provided a of in accordance with MYCA requirements. • when turf is or sheets,c sat fence and inlet protection and other erosion control devices shall be n resistant of and adjacent streets,alleys and walks shall be cleaned as needed to delism a site that is erosion resistan <br /> } benchmark for your use in determining elevations for C0r1StrnCliOn on • Concrete truck washout shall b.:in the plastic dread ditch and dispose of washings as solid warm. and clean. <br /> $;PPE 0 this site.The elevations shown relate only to the benchmark provided on <br /> P, this survey.Use that benchmark and check at least one other feature • Sediment control devices shall be regularly inspected and alio major rainfall events and shall he cleaned <br /> " shown on the survey when determining other elevations for use on this sed r paved as necessary to provide dowustrwnt protection. N 8972'06"E <br /> site or before beginning construction. —f <br /> 6. Note that all building dimensions and building tie dimensions to the I 1 <br /> property lines,are taken from the siding and or stucco of the building. I 1 <br /> 6. While we show a proposed location for this home or addition,we are not <br /> as familiar with your proposed plans as you,your architect,or the <br /> builder are. Review our proposed location of the improvements and <br /> proposed yard grades carefully to verify that they match your plans <br /> before construction begins. Also,we are not as familiar with local codes <br /> and minimum requirements as the local building and zoning officials in g <br /> this community are. Be sure to show this survey to said officials,or any 24 <br /> other officials that may have jurisdiction over the proposed <br /> improvements and obtain their approvals before beginning construction <br /> or planning improvements to the property. g <br /> 7. Note that all building dimensions and building tie dimensions to they -INSTALL SILT <br /> property lines,are taken from the siding and or stucco of the building. <br /> FENCE/&,ROLL <br /> 8. While we show the building setback lines per the City of Orono web site,we suggest you show this survey to the appropriate city officials to be Is I �"` <br /> sure that the setback lines are shown correctly.Do this BEFORE you use N <br /> this survey to design anything for this site. „ma 3 <br /> o0 <br /> ti <br /> STANDARD SYMBOLS&CONVENTIONS: Existing i cT SF�SF <br /> "•"Denotes iron survey marker,set,unless otherwise noted. Garage - f�1 n.J - 7 O' <br /> REMOVE TREE /=;i 1 1-15'N�'$ry / <br /> ff 1o"Vapls <br /> m x Ir.9 WC +�6a .. <br /> \ r.J J0.5I71 <br /> \-3.j. " pt^'PO SCI( -9°8rr�A I Dwelling <br /> PROPOSED ' d 111 r t <br /> ExistingDWELLING ' .R\h\ w I <br /> Owed/ing !Rh <br /> Ig:;:".::' <br /> �ENTRANCE \ 3' -. <br /> LEGEND <br /> LIDUZe 11 ELEV. x:\ <br /> (FIll2E EXIST. <br /> 6YJST/NG CONTOUR ;1 t:; r FOUNDATION) Si I,k ` ec --INSTALL SIIO T <br /> 8�2 2aa.. 4 R. <br /> ,_ -.. : FENCE/B10 ROLL <br /> J <br /> .,EUSTINC SPOT ELEVATION s <br /> -..._ I... - - ;rile"Awl t <br /> 5IPROPOSED SPOT ELSEA770N &y5,f-7 — - I <br /> . <br /> -- <br /> DR!/N.IC,ARAD"—FLO, I ' N 897206"E o <br /> 'ALT PENCE/RIO ROLL SF — LE Existing Edge of Bit.Rood Benchmark: <br /> Y TOR6.2 o/yore valve93 <br /> Dem REVISION DESCRIPTIO! DWG ORIENTATION SONE CLIENT/JOB ADDRESS / �� mYI suit SURVEYED: SHEET TITLE SHEET NO. <br /> S-In-tr RENEWED ElaSrwG tear Advance " W°� <br /> �� _ JukY tae,Role JP0AEDStJRvEY-4 <br /> LORIZAP1A6 Q"�m"'" suRveYeo nYovANeeo suRv �'1PA <br /> u .. V\0 20' 40' ORONO, MN mssemssa .5s•., ,MBER <br /> rrrcos2trrura�s MAY 25 2017 MAY 25,2017 <br /> w,p. omt 170384 JR sErEl I of <br />
The URL can be used to link to this page
Your browser does not support the video tag.