My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-19-2017 Planning Commission Packet
Orono
>
Planning Commission
>
2017
>
06-19-2017 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2018 10:48:13 AM
Creation date
2/8/2018 10:44:02 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Additionally,County Road 15,which is the key roadway serving <br /> Orono's suburban areas and particularly the Navarre area,is far over <br /> capacity. It is not practical from an economic or environmental <br /> standpoint to expand County Road 15 to increase its capacity. There- <br /> fore,additional housing options will be primarily developed along Orono's <br /> Highway 12 corridor in specifically identified areas that are or will be <br /> served by urban services.13(Emphasis added.) <br /> The CMP also lists "a number of challenges to be addressed as Navarre <br /> redevelops in the years to come."14 The first of these relates to keeping/ <br /> making Navarre a pedestrian-friendly location: <br /> High traffic volumes and the existing traffic management infrastruc- <br /> ture result in poor pedestrian accessibility.Pedestrians have limited <br /> options for crossing CR 15 or CR 19.15 <br /> In the seven years since the CMP was updated,the traffic and pedestrian <br /> situations have significantly worsened not only due to Orono's growth, <br /> but also due to the growth in surrounding communities,increasing <br /> through traffic.Adding 200 to 300 car trips per day for the proposed pro- <br /> ject would exacerbate in a meaningful way the current bad and danger- <br /> ous traffic and pedestrian situations in Navarre. <br /> Established Neighborhood Character-The height of the proposed build- <br /> ing far exceeds that of adjacent structures and is entirely inconsistent with <br /> the established neighborhood character. <br /> Northwest of the proposed building is the Freshwater Office Building <br /> ("FOB").As shown by the pictures on the following page,the FOB is one <br /> story when viewed from the front and two stories when viewed from the <br /> back.16 <br /> 13 CMP page 3C-25. <br /> 14 CMP page 3B-38. <br /> 15 CMP page 3B-38. <br /> 16 Small architectural details of the FOB extend above the rest of the structure, <br /> but they do not change the one-story front/two-story back of the FOB. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.