Laserfiche WebLink
O CITY OF ORONO <br /> SEPTIC SYSTEM APPROVAL. <br /> - CITY of ORONO <br /> Municipal OMces <br /> Past office Box 66 <br /> Crystal Bay,Minnesota 55313-0066 <br /> �kESB0 <br /> LOCATION: 150 North Shore Dr. W. <br /> OWNER: <br /> GENERAL CONTRACTOR: SEPTIC CONTRACTOR: <br /> SITE EVALUATOR: Swedlund Septic Service REPORT DATE: August 17, 1998 <br /> The City of Orono has Approved your on-site system design as of August 21, 1998 <br /> (approved-disapproved) (date) <br /> with the following comments: <br /> THIS IS NOT A PERMIT. This is a design approval form which must accompany the site plan. A permit must <br /> be issued to a licensed septic contractor prior to installation. A list of currently licensed septic contractors is <br /> enclosed. <br /> NOTICE TO INSTALLERS: Any changes to the approved plans and specs must have prior.approval of the <br /> Inspector (473-7357). Call for inspections 24 hours in advance. <br /> ALL DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must remain <br /> in place until final site grading. Approval to pour footings will not be granted until the Inspections Department <br /> has verified that primary and alternate sites are adequately protected. <br /> NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, etc.) is allowed within 20' <br /> of tested drainfield sites either before or after system construction. Compaction of these areas could render them <br /> unusable prohibiting the timely completion and or limiting the long term use of the property. <br /> A site copy will be available at the City Offices for the septic contractor. <br /> CITY OF O O <br /> By <br /> Stephen e , On--sife Systems Manager <br /> TELEPHONE-473-7357•FAX-473-0510 <br />